Collaborative production and predictive maintenance scheduling for flexible flow shop with stochastic interruptions and monitoring data

被引:8
|
作者
Xia, Tangbin [1 ]
Ding, Yutong [1 ]
Dong, Yifan [1 ]
Chen, Zhen [1 ]
Zheng, Meimei [1 ]
Pan, Ershun [1 ]
Xi, Lifeng [1 ]
机构
[1] Shanghai Jiao Tong Univ, Sch Mech Engn, SJTU Fraunhofer Ctr, State Key Lab Mech Syst & Vibrat, Shanghai 200240, Peoples R China
基金
中国国家自然科学基金; 上海市自然科学基金;
关键词
Flexible flow shop problem; Predictive maintenance; Production scheduling; Variable neighborhood search; Stochastic interruption; VARIABLE NEIGHBORHOOD SEARCH; PREVENTIVE MAINTENANCE; MANUFACTURING SYSTEMS; OPTIMIZATION APPROACH; SETUP TIME; SIMULATION; ALGORITHM;
D O I
10.1016/j.jmsy.2022.10.016
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Flexible flow shop problem (FFSP) has been extensively researched in recent years. However, machine deterioration and stochastic production interruptions noticeably affect the regular job process in practice, incurring great cost. It is significant to incorporate the condition-based predictive maintenance scheduling and the production modification for interruptions with traditional FFSP. Nevertheless, this issue is rarely investigated in the existing FFSP studies. To solve the FFSP with maintenance and stochastic interruptions (FFSP-MSI), this paper proposes a collaborative optimization policy of production and maintenance (COPPM) by considering stochastic interruptions and monitoring data utilization for total cost reduction. For maintenance scheduling, a real-time prognosis updating method is leveraged based on monitoring data to capture the individual machine degradations. Assisted by the prognosis output, the optimal maintenance intervals are dynamically derived through a cost rate model. For production optimization, a variable neighborhood search (VNS) algorithm is presented to obtain the nearly- optimal initial production plan and the production modification for stochastic interruptions caused by machine failures and random jobs. This proposed COPPM comprehensively determines the costeffective maintenance cycle, job order and machine selection for each job. Computational experiments of the wind turbine blade process are presented to certify the economic effectiveness of COPPM. Compared with the traditional production and maintenance scheduling method, the COPPM achieves 13.68 % total cost reduction in average under various problem scales.
引用
收藏
页码:640 / 652
页数:13
相关论文
共 50 条
  • [1] Production Scheduling with Mould Maintenance in Flow Shop
    Shen, Lu
    Yang, Hongbing
    Gao, Sheng
    Fang, Jia
    PROCEEDINGS OF THE 2016 4TH INTERNATIONAL CONFERENCE ON SENSORS, MECHATRONICS AND AUTOMATION (ICSMA 2016), 2016, 136 : 730 - 733
  • [2] Local Search for Integrated Predictive Maintenance and Scheduling in Flow-Shop
    Ecoretti, Andrea
    Ceschia, Sara
    Schaerf, Andrea
    METAHEURISTICS, MIC 2022, 2023, 13838 : 260 - 273
  • [3] Deep Reinforcement Learning for Distributed Flow Shop Scheduling with Flexible Maintenance
    Yan, Qi
    Wu, Wenbin
    Wang, Hongfeng
    MACHINES, 2022, 10 (03)
  • [4] Simultaneous Scheduling of Production and Maintenance in a Flexible Job-Shop Workshop
    Bencheikh, Ghita
    Bettayeb, Belgacem
    PROCEEDING OF THE 7TH INTERNATIONAL CONFERENCE ON LOGISTICS OPERATIONS MANAGEMENT, GOL 2024, VOL 2, 2024, 1105 : 283 - 292
  • [5] Model for Integrating Production Scheduling and Maintenance Planning of Flow Shop Production System
    Al-Shayea, Adel
    Fararah, Emad
    Nasr, Emad Abouel
    Mahmoud, Haitham A.
    IEEE ACCESS, 2020, 8 : 208826 - 208835
  • [6] Scheduling optimization of flexible flow shop
    Liu, Xuefeng
    Shen, Zhenhui
    Dai, Lingmin
    PROCEEDINGS OF 2018 IEEE 4TH INFORMATION TECHNOLOGY AND MECHATRONICS ENGINEERING CONFERENCE (ITOEC 2018), 2018, : 1652 - 1657
  • [7] A holonic approach to flexible flow shop scheduling under stochastic processing times
    Wang, K.
    Choi, S. H.
    COMPUTERS & OPERATIONS RESEARCH, 2014, 43 : 157 - 168
  • [8] Collaborative optimization of interval number reentrant hybrid flow shop scheduling and preventive maintenance
    Dong J.
    Ye C.-M.
    Kongzhi yu Juece/Control and Decision, 2021, 36 (11): : 2599 - 2608
  • [9] Flexible Job Shop Scheduling Problem Considering Upper Bounds for the Amount of Interruptions Between Operations and Machines Maintenance Activities
    Mahdavi, K.
    Mohammadi, M.
    Ahmadizar, F.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2024, 37 (08): : 1600 - 1614
  • [10] Flexible Job Shop Scheduling Problem Considering Upper Bounds for the Amount of Interruptions Between Operations and Machines Maintenance Activities
    Mahdavi K.
    Mohammadi M.
    Ahmadizar F.
    International Journal of Engineering, Transactions B: Applications, 2024, 37 (08): : 1600 - 1614