Project Management Pattern Selection of Post-disaster Reconstruction Projects Based on Multi-dimensions Perspective

被引:0
|
作者
Zhang, Xinli [1 ]
Jia, Limin [1 ]
Li, Jie [1 ]
机构
[1] Sichuan Univ, Bussiness Sch, Chengdu 610064, Peoples R China
关键词
Management pattern selection; post-disaster reconstruction projects; Factor analysis; Correlation analysis;
D O I
10.4028/www.scientific.net/AMM.501-504.2659
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study selects nine indicators impacting on project management pattern selection of post-disaster reconstruction projects. Questionnaire investigation is carried out based on the nine indicators and the needed data for this study is collected. Using factor analysis method, the nine indicators are classified into three main dimensions, which are internal factors, external factors and project goals. Correlation analysis between three main dimensions and six project management patterns is conducted to find the key dimension affecting each management pattern selection. According to the above analysis process, this study provides a selection flowchart of post-disaster reconstruction project management pattern, which may provide a new way for post-disaster reconstruction project pattern selection.
引用
收藏
页码:2659 / 2663
页数:5
相关论文
共 50 条
  • [1] Project management challenges for post-disaster reconstruction projects in Angola: a public sector perspective
    Sospeter, Nyamagere Gladys
    Rwelamila, Pantaleo M. D.
    Gimbi, Joaqium
    [J]. INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2021, 14 (03) : 767 - 787
  • [2] Project Management Success for Post-Disaster Reconstruction Projects: International NGOs Perspectives
    Ismail, Dzulkarnaen
    Majid, Taksiah A.
    Roosli, Ruhizal
    Ab Samah, Noorazam
    [J]. 4TH INTERNATIONAL CONFERENCE ON BUILDING RESILIENCE, INCORPORATING THE 3RD ANNUAL CONFERENCE OF THE ANDROID DISASTER RESILIENCE NETWORK, 2014, 18 : 120 - 127
  • [5] Advantages and limitations of community-based post-disaster housing reconstruction projects
    Ophiyandri, Taufika
    Amaratunga, Dilanthi
    Keraminiyage, Kaushal
    [J]. INTERNATIONAL JOURNAL OF DISASTER RESILIENCE IN THE BUILT ENVIRONMENT, 2016, 7 (04) : 420 - 431
  • [6] Key Components in Schedule Development of Post-Disaster Reconstruction Projects
    Safapour, Elnaz
    Kermanshachi, Sharareh
    [J]. CONSTRUCTION RESEARCH CONGRESS 2022: INFRASTRUCTURE, SUSTAINABILITY, AND RESILIENCE, 2022, : 48 - 56
  • [7] A systems view of temporary housing projects in post-disaster reconstruction
    Johnson, Cassidy
    Lizarralde, Gonzalo
    Davidson, Colin H.
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2006, 24 (04) : 367 - 378
  • [8] Current State of Post-Disaster Reconstruction Projects: A Bibliometric Analysis
    Baarimah, Abdullah O.
    Alaloul, Wesam Salah
    Liew, M. S.
    Alawag, Aawag Mohsen
    Musarat, Muhammad Ali
    Alzubi, Khalid Mhmoud
    [J]. 2021 INTERNATIONAL CONFERENCE ON DECISION AID SCIENCES AND APPLICATION (DASA), 2021,
  • [9] Competence-based system development for post-disaster project management
    von Meding, Jason
    Wong, Joel
    Kanjanabootra, Sittimont
    Tafti, Mojgan Taheri
    [J]. DISASTER PREVENTION AND MANAGEMENT, 2016, 25 (03) : 375 - 394
  • [10] Breaking the vicious cycle of flood disasters: Goals of project management in post-disaster rebuild projects
    Kim, Kyung Nam
    Choi, Jae-ho
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2013, 31 (01) : 147 - 160