Settlement of Materials and Life Science Experimental Facility at J-PARC

被引:3
|
作者
Harada, M. [1 ]
Meigo, S. [1 ]
Ito, M. [1 ]
Dantsuji, E. [1 ]
Takagiwa, K. [1 ]
Takada, H. [1 ]
Maekawa, F. [1 ]
Futakawa, M. [1 ]
Nakamura, M. [1 ]
Miyake, Y. [2 ]
Ikeda, Y. [1 ]
机构
[1] Japan Atom Energy Agcy, Mat & Life Sci Div, J PARC Ctr, Tokai, Ibaraki 3191195, Japan
[2] High Energy Accelerator Res Org, Muon Sci Lab, Tsukuba, Ibaraki 3050801, Japan
关键词
Settlement; Level measurement; Settlement expectation; J-PARC; MLF;
D O I
10.1016/j.nima.2008.11.058
中图分类号
TH7 [仪器、仪表];
学科分类号
0804 ; 080401 ; 081102 ;
摘要
A lot of even and uneven settlement is expected to occur due to the heavy weight of the buildings and shields located at the Materials and Life Science Experimental Facility (MLF) and in the proton beam line (3NBT) that runs from the 3 GeV Rapid-Cycling Synchrotron (RCS) to the neutron target at the Japan Proton Accelerator Research Complex (J-PARC). Because of this, and in order to achieve the necessary alignment of less than I mm in precision, the settlement that has occurred with the MLF building and the 3NBT tunnel has been periodically surveyed (level measurement) since June 2004 until now when the MLF building has been completed. The survey results were used in determining the levels at which the beam line components were installed. The survey results indicated that the values of the settlement that had taken place were almost proportional to the located weight and could be used in estimating the settlement that would take place in the future. These results were reflected in the alignment of the proton and beam line components. (C) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:87 / 90
页数:4
相关论文
共 50 条
  • [1] Users' beam interlock system at the Materials and Life Science Experimental Facility of J-PARC
    Kai, Tetsuya
    Sakai, Kenji
    Nakatani, Takeshi
    Takada, Hiroshi
    Oikawa, Kenichi
    Shimomura, Koichiro
    Higemoto, Wataru
    Kinoshita, Hidetaka
    Ooi, Motoki
    Kaminaga, Masanori
    [J]. NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2009, 600 (01): : 176 - 178
  • [2] Construction status of a general control system for the Materials and Life Science Experimental Facility (MLF) at J-PARC
    Sakai, Kenji
    Ooi, Motoki
    Kai, Tetsuya
    Kinoshita, Hidetaka
    Kawasaki, Susumu
    Watanabe, Akihiko
    Kaminaga, Masanori
    Futakawa, Masatoshi
    [J]. NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2009, 600 (01): : 75 - 77
  • [3] Automated Pulsed Magnet System for Neutron Diffraction Experiments at the Materials and Life Science Experimental Facility in J-PARC
    Watanabe, Masao
    Kihara, Takumi
    Nojiri, Hiroyuki
    [J]. QUANTUM BEAM SCIENCE, 2023, 7 (01)
  • [4] Hadron Experimental Facility at J-PARC
    H. Noumi
    [J]. Few-Body Systems, 2013, 54 : 813 - 819
  • [5] Hadron Experimental Facility at J-PARC
    Noumi, H.
    [J]. FEW-BODY SYSTEMS, 2013, 54 (7-10) : 813 - 819
  • [6] J-PARC Facility
    Sawada, Shinya
    [J]. NUCLEAR PHYSICS A, 2010, 834 (1-4) : 701C - 706C
  • [7] J-PARC transmutation experimental facility program
    Maekawa F.
    [J]. Maekawa, Fujio (maekawa.fujio@jaea.go.jp), 2018, Japan Society of Plasma Science and Nuclear Fusion Research (13)
  • [8] J-PARC Transmutation Experimental Facility Program
    Maekawa, Fujio
    [J]. PLASMA AND FUSION RESEARCH, 2018, 13
  • [9] Design of J-PARC Transmutation Experimental Facility
    Sasa, Toshinobu
    [J]. PROGRESS IN NUCLEAR ENERGY, 2015, 82 : 64 - 68
  • [10] Conceptual design of an abnormality sign determination system for the general control system of the Materials and Life Science Experimental Facility at J-PARC
    Sakai, K.
    Ooi, M.
    Teshigawara, M.
    Naoe, T.
    Haga, K.
    Watanabe, A.
    [J]. JOURNAL OF NEUTRON RESEARCH, 2020, 22 (2-3) : 337 - 343