Severe accident analysis to verify the effectiveness of severe accident management guidelines for large pressurized heavy water reactor

被引:2
|
作者
Gokhale, O. S. [1 ]
Mukhopadhyay, D. [1 ]
Lele, H. G. [1 ]
Singh, R. K. [1 ]
机构
[1] Bhabha Atom Res Ctr, Reactor Safety Div, Bombay 400085, Maharashtra, India
关键词
Abbreviations; ASDV; atmospheric steam discharge valves; calandria tube; calandria vessel; CT; CV; ECCS; emergency core cooling system; emergency operating procedure; EOP; IH; inlet header; main steam-line safety valve; MSSV; OH; OPRD; outlet header; over pressure rupture disk; PCP; PHTS; PHWR; pressure tube; pressurized heavy water reactor; primary circulation pump; primary heat transport system; PT; RD; rupture disk; SAMG; SBO; severe accident management guidelines; SG; station black out; steam generator;
D O I
10.1016/j.nucengdes.2014.06.039
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The pressurized heavy water reactor (PHWR) contains both inherent and engineered safety features that help the reactor become resistant to severe accident and its consequences. However in case of a low frequency severe accident, despite the safety features, procedural action should be in place to mitigate the accident progression. Severe accident analysis of such low frequency event provides insight into the accident progression and basis to develop the severe accident management guidelines (SAMG). Since the order of uncertainty in the progression path of severe accident is very high, it is necessary to study the consequences of the SAMG actions prescribed. The paper discusses severe accident analysis for large PHWRs for multiple failure transients involving a high pressure scenario (initiation event like SBO with loss of emergency core cooling system and loss of moderator cooling). SAMG actions prescribed for such a scenario include water injection into steam generator, calandria vessel or calandria vault at different stages of accident. The effectiveness of SAMG actions prescribed has been investigated. It is found that there is sufficient time margin available to the operator to execute these SAMG actions and the progression of severe accident is arrested in all the three cases. (C) 2014 Elsevier B.V. All rights reserved.