The Space Shuttle Probabilistic Risk Assessment Framework

被引:0
|
作者
Hsu, Feng [1 ]
机构
[1] NASA, JSC SAIC, Johnson Space Ctr, Washington, DC 20546 USA
关键词
Probabilistic Risk Assessment; System Safety & Mission Assurance;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper introduces a unique modeling framework for developing PRA of large and complex-engineered systems. such as used in the current Space Shuttle PRA tit NASA. With an overview of the specific methodology and techniques employed in the Space Shuttle PRA modeling process. the paper further describes a structured multi-phase and multi-level modeling approach (SMM). which is utilized to treat the overwhelming complexities of logic structure as well (is the logistics of model development, integration and quantification processes. It is demonstrated that flit, SMM modeling technique can be used as a simple and efficient alternative approach for PRA modeling of extremely large and complex engineered systems. It should be noted that the examples shown tire illustrative of the model features, but not necessarily of any detailed accident sequence produced by v the Space Shuttle PRA (SPRA) study.
引用
收藏
页码:1 / 9
页数:9
相关论文
共 50 条
  • [1] Space shuttle probabilistic risk assessment: Methodology and application
    Maggio, G
    [J]. ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 1996 PROCEEDINGS, 1996, : 121 - 132
  • [2] Modeling process risk contributions for the Space Shuttle Probabilistic Risk Assessment (PRA)
    Vesely, WE
    Boyer, RL
    [J]. PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL I AND II, PROCEEDINGS, 2002, : 941 - 947
  • [3] Space shuttle operational risk assessment
    Fragola, JR
    Maggio, G
    [J]. SPACE TECHNOLOGY AND APPLICATIONS INTERNATIONAL FORUM (STAIF-96), PTS 1-3: 1ST CONFERENCE ON COMMERCIAL DEVELOPMENT OF SPACE; 1ST CONFERENCE ON NEXT GENERATION LAUNCH SYSTEMS; 2ND SPACECRAFT THERMAL CONTROL SYMPOSIUM; 13TH SYMPOSIUM ON SPACE NUCLEAR POWER AND PROPULSION - FUTURE SPACE AND EARTH SCIENCE MISSIONS - SPECIAL TOPIC; REMOTE SENSING FOR COMMERCIAL, CIVIL AND SCIENCE APPLICATIONS - SPECIAL TOPIC, 1996, (361): : 719 - 720
  • [4] The space shuttle probabilistic risk assessment framework - A structured multiphase multi-level modeling approach for large and complex engineered systems
    Hsu, F
    Railsback, J
    [J]. PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL 1- 6, 2004, : 1466 - 1473
  • [5] The Leonid Meteors and Space Shuttle Risk Assessment
    James F. Pawlowski
    Thomas T. Hebert
    [J]. Earth, Moon, and Planets, 1998, 82-83 : 249 - 256
  • [6] The Leonid meteors and Space Shuttle risk assessment
    Pawlowski, JF
    Hebert, TT
    [J]. EARTH MOON AND PLANETS, 1998, 82-3 (0): : 249 - 256
  • [7] A dynamic probabilistic risk model applied to the space shuttle main engine
    Maggio, G
    Visser, BJ
    [J]. PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT (PSAM 4), VOLS 1-4, 1998, : 2455 - 2461
  • [8] A maintenance process oriented probabilistic risk assessment of the space shuttle orbital maneuvering system and reaction control system
    Vantine, WL
    Loomis, RJ
    Fragola, JR
    Maggio, G
    Lofgren, EV
    [J]. SAFETY AND RELIABILITY, VOLS 1 & 2, 1999, : 1071 - 1076
  • [9] Framework of probabilistic risk assessment for security and reliability
    Liu, Qisi
    Xing, Liudong
    Wang, Chaonan
    [J]. 2017 IEEE SECOND INTERNATIONAL CONFERENCE ON DATA SCIENCE IN CYBERSPACE (DSC), 2017, : 619 - 624
  • [10] Probabilistic risk analysis for the NASA space shuttle:: a brief history and current work
    Paté-Cornell, E
    Dillon, R
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2001, 74 (03) : 345 - 352