An Improved Solving Approach for Interval-Parameter Programming and Application to an Optimal Allocation of Irrigation Water Problem

被引:13
|
作者
Yang, Gaiqiang [1 ,2 ]
Guo, Ping [1 ,4 ]
Li, Mo [1 ]
Fang, Shiqi [1 ]
Zhang, Liudong [1 ,3 ]
机构
[1] China Agr Univ, Ctr Agr Water Res China, Beijing 100083, Peoples R China
[2] Taiyuan Univ Sci & Technol, Inst Environm Sci, Taiyuan 030024, Shanxi, Peoples R China
[3] Yunnan Agr Univ, Coll Water Conservancy & Hydropower & Architectur, Kunming 650201, Peoples R China
[4] China Agr Univ, Coll Water Conservancy & Civil Engn, Beijing 100083, Peoples R China
基金
中国国家自然科学基金; 对外科技合作项目(国际科技项目);
关键词
Interval linear programming; Interval-parameter; Single-step method; Two-step method; Agricultural water management; SOLID-WASTE MANAGEMENT; RESOURCES MANAGEMENT; ROBUST OPTIMIZATION; UNCERTAINTY; FUZZY; MODEL; COEFFICIENTS; CHINA;
D O I
10.1007/s11269-015-1186-5
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this study, an improved single-step method (SSM) is developed based on two-step method (TSM) to solve the interval-parameter linear programming (ILP) model of which the right-hand sides are highly uncertain. Two numerical examples are presented to ascertain appropriate value of. in SSM. The risk preference degree of. could be 0.8 for maximum objective function type. To demonstrate the applicability of the developed method, an agricultural water management problem has been provided in the case study section. The results show that SSM is more effective than TSM for complete solutions. There is only partial solution obtained from the first submodel of TSM, because the right-hand side of the wheat output constraint is highly uncertain. Finally, local farmers' net benefit reaches to [8.949, 12.442] x 10(8) RMB (the unit of Chinese currency). The priority order of crops that are needed to be irrigated by surface water is maize > wheat > cotton.
引用
收藏
页码:701 / 729
页数:29
相关论文
共 50 条
  • [1] An Improved Solving Approach for Interval-Parameter Programming and Application to an Optimal Allocation of Irrigation Water Problem
    Gaiqiang Yang
    Ping Guo
    Mo Li
    Shiqi Fang
    Liudong Zhang
    Water Resources Management, 2016, 30 : 701 - 729
  • [2] Optimal Water Allocation of Irrigation District Based on Interval-parameter Two-stage Stochastic Fuzzy Credibility Constrained Programming
    Yue Q.
    Guo P.
    Wang Y.
    Zhang C.
    Li P.
    Nongye Jixie Xuebao/Transactions of the Chinese Society for Agricultural Machinery, 2019, 50 (04): : 228 - 235
  • [3] Optimal water resource planning under fixed budget by interval-parameter credibility constrained programming
    Zhang, Y. M.
    Huang, G. H.
    ENGINEERING OPTIMIZATION, 2011, 43 (08) : 879 - 889
  • [4] The Application of a Water Rights Trading Model Based on two-Stage Interval-Parameter Stochastic Programming
    Qiang Fu
    Ke Zhao
    Dong Liu
    Qiuxiang Jiang
    Tianxiao Li
    Changhong Zhu
    Water Resources Management, 2016, 30 : 2227 - 2243
  • [5] The Application of a Water Rights Trading Model Based on two-Stage Interval-Parameter Stochastic Programming
    Fu, Qiang
    Zhao, Ke
    Liu, Dong
    Jiang, Qiuxiang
    Li, Tianxiao
    Zhu, Changhong
    WATER RESOURCES MANAGEMENT, 2016, 30 (07) : 2227 - 2243
  • [6] Interval-parameter robust quadratic programming for water quality management under uncertainty
    Li, Y. P.
    Huang, G. H.
    Nie, S. L.
    Mo, D. W.
    ENGINEERING OPTIMIZATION, 2008, 40 (07) : 613 - 635
  • [7] Optimal Water Resources Planning Based on Interval-parameter Two-stage Robust Stochastic Programming Model
    Chen H.
    Wang Q.
    Li X.
    Wang Z.
    Li C.
    Nongye Jixie Xuebao/Transactions of the Chinese Society for Agricultural Machinery, 2019, 50 (03): : 271 - 280
  • [8] An Interval-Parameter Based Two-Stage Stochastic Programming for Regional Electric Power Allocation
    Dai, Jingqi
    Li, Xiaoping
    PROCEEDINGS OF THE ELEVENTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2018, : 1111 - 1121
  • [9] 0-1 Piecewise linearization approach for interval-parameter nonlinear programming: application to environmental management under uncertainty
    Li, Y. P.
    Huang, G. H.
    Yang, Z. F.
    Nie, S. L.
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2009, 36 (06) : 1071 - 1084
  • [10] SOLVING PROBLEM OF OPTIMAL ALLOCATION OF RESOURCES BY METHOD OF QUADRATIC PROGRAMMING
    VORONOV, AA
    PETRUSHI.EP
    AUTOMATION AND REMOTE CONTROL, 1966, 27 (11) : 1921 - &