Lead time estimation method for complex product development process

被引:16
|
作者
Jun, Hong-Bae
Park, Jin-Young
Suh, Hyo-Won
机构
[1] Swiss Fed Inst Technol, Lab Comp Aided Design & Prod, STI IPR LICP, CH-1015 Lausanne, Switzerland
[2] Korea Adv Inst Sci & Technol, Dept Ind Engn, Taejon 305701, South Korea
来源
关键词
product development process; lead time; process pattern; series-parallel network;
D O I
10.1177/1063293X06073302
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
As the lifecycle of a product gets shorter, the timely introduction of new products becomes an invaluable asset to most manufacturing firms. It is needless to say that the competitive edge is given to a firm with the better knowledge on how to estimate the product development (PE) process because reducing the product development time is a critical issue for manufacturing firms. However, it is difficult to estimate the performance of the PD process because of its complexity. So far, in spite of its strategic importance, only a few studies have been done. To overcome this limitation, in this study, the authors provide a heuristic algorithm that can estimate the lead time of a complex PD process by series-parallel network transformation and network reduction methods with estimates of the makespans of branch-merge types. To show the usefulness of this method, computational experiments have been carded out.
引用
收藏
页码:313 / 328
页数:16
相关论文
共 50 条
  • [1] A Formal Model of a Complex Estimation Method in Lean Product Development Process
    Kamalov, Leonid
    Pokhilko, Alexander
    Tylaev, Timur
    [J]. NEW WORLD SITUATION: NEW DIRECTIONS IN CONCURRENT ENGINEERING, 2010, : 285 - 289
  • [2] Evaluation Method of Manufacturing Resources in Complex Product Development Process
    Yuan, Yiping
    Sun, Wenlei
    Li, Xiaojuan
    [J]. RECENT TRENDS IN MATERIALS AND MECHANICAL ENGINEERING MATERIALS, MECHATRONICS AND AUTOMATION, PTS 1-3, 2011, 55-57 : 1386 - 1391
  • [3] Value stream mapping to reduce the lead-time of a product development process
    Tyagi, Satish
    Choudhary, Alok
    Cai, Xianming
    Yang, Kai
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2015, 160 : 202 - 212
  • [4] Integration Technology for Complex Product Development Process
    Xu Ci-jun
    Li Ai-ping
    Liu Xue-mei
    [J]. 2009 INTERNATIONAL CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION, VOL III, 2009, : 781 - 784
  • [5] An intelligent estimation method for product design time
    Xu, D.
    Yan, H. -S.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 30 (7-8): : 601 - 613
  • [6] An intelligent estimation method for product design time
    D. Xu
    H. -S. Yan
    [J]. The International Journal of Advanced Manufacturing Technology, 2006, 30 : 601 - 613
  • [7] Lead time modeling and acceleration of product design and development
    Narahari, Y
    Viswanadham, N
    Kumar, VK
    [J]. IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1999, 15 (05): : 882 - 896
  • [8] The value of product development lead time in software startup
    Hilmola, OP
    Helo, P
    Ojala, L
    [J]. SYSTEM DYNAMICS REVIEW, 2003, 19 (01) : 75 - 82
  • [9] Lead time reduction and process enhancement for a low volume product
    Balaji, M.
    Dinesh, S. N.
    Raja, S.
    Subbiah, Ram
    Kumar, P. Manoj
    [J]. MATERIALS TODAY-PROCEEDINGS, 2022, 62 : 1722 - 1728
  • [10] NEW TESTING PROCESS SIGNIFICANTLY REDUCES PRODUCT LEAD TIME
    GOODDEN, RL
    [J]. QUALITY PROGRESS, 1991, 24 (09) : 152 - 152