Managing construction site communication using the responsibility assignment matrix (RAM) system

被引:4
|
作者
Shrahily, Raid [1 ]
Medjdoub, Benachir [2 ]
Klalib, Hynda [3 ]
Chalal, Moulay [2 ]
Alwetaishi, Mamdooh [4 ]
机构
[1] Albaha Univ, Architecture Dept, Coll Engn, Alaqiq, Saudi Arabia
[2] Nottingham Trent Univ, Sch Architecture Design & Built Environm, Nottingham, England
[3] Nottingham Trent Univ, Dept Civil Engn, Nottingham, England
[4] Taif Univ, Coll Engn, Dept Civil Engn, At Taif, Saudi Arabia
关键词
Responsibility assignment matrix; standard work breakdown structure; standard organisation breakdown structure; communication tools assignment; construction defects; BIM; BIM; IMPLEMENTATION; MANAGEMENT; CAD;
D O I
10.1080/15623599.2020.1837717
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The construction industry in the UK wastes 1 pound billion per year due to construction defects that are mainly caused by a communication failure between organisations operating on the construction site. Meanwhile, the introduction of the BIM strategy has become a mandatory requirement by the government in order to reduce costs by 33% and speed up project delivery by 50% without sacrificing quality. Since then, the industry has seen a global reaction to the BIM Level 2 programme and a significant cost-saving in the UK of 1.2 pound billion in 2014/15, rising from 840 pound million in 2013/14. However, communication remains a major issue to achieve the BIM Level 3 as it requires all organisations involved to use a single platform to facilitate communication. This paper, therefore, fits within the BIM implementation programme by addressing the communication issues and construction defects on-site toward formulating a communication framework for the construction industry in the UK. This will help optimise communication and manage construction defects efficiently. The study takes advantage of the Responsibility Assignment Matrix (RAM), the widely known management system and uses it to assign communication tools for each organisation in relation to the construction stages throughout two phases of data collection. Phase 1 involves two qualitative data collection methods of an in-depth review of the relevant literature (document analysis) and construction site observation. To facilitate site observation and data collection, the researcher collaborated with GF Tomlinson group, a Derby-based construction company, as the case study. Phase 2 involves an online survey, targeting a total number of 328 participants, including professionals and academics. Results of phase 1 are presented as the Communication Tools Assignment 1 (CTA1) and phase 2 results inform the Communication Tools Assignment 2 (CTA2). The study contribution is to develop a framework that recommends the appropriate communication tools for organisations at different construction stages, and which shows the possible types and causes of construction defects. Moreover, the study found three types of construction defects by applying 3D laser scanning for framework mentoring.
引用
收藏
页码:2966 / 2986
页数:21
相关论文
共 50 条
  • [1] Development of automated communication of system for managing site information using internet technology
    Dawood, N
    Akinsola, A
    Hobbs, B
    [J]. AUTOMATION IN CONSTRUCTION, 2002, 11 (05) : 557 - 572
  • [2] An incentive pay system for project management based on responsibility assignment matrix and fuzzy linguistic variables
    Yang, Taho
    Chen, Chiu-Wen
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2009, 36 (10) : 12585 - 12591
  • [3] Managing information complexity using system dynamics on construction projects
    Khan, Khurram Iqbal Ahmad
    Flanagan, Roger
    Lu, Shu-Ling
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2016, 34 (03) : 192 - 204
  • [4] Managing On-Site Production Using an Activity and Flow-Based Construction Model
    Garcia-Lopez, Nelly P.
    Fischer, Martin
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (01)
  • [5] Wireless safety monitoring of a water pipeline construction site using LoRa communication
    Lee, Sahyeon
    Gil, Sang-Kyun
    Cho, Soojin
    Shin, Sung Woo
    Sim, Sung-Han
    [J]. SMART STRUCTURES AND SYSTEMS, 2022, 30 (05) : 433 - 446
  • [6] Managing construction waste on-site through system dynamics modelling: the case of Hong Kong
    Hao, Jian
    Hill, Martyn
    Shen, Li
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2008, 15 (02) : 103 - +
  • [7] Efficient channel assignment using the genetic algorithm in the cellular mobile communication system
    Yoshino, J
    Ohtomo, I
    [J]. 5TH INTERNATIONAL SYMPOSIUM ON WIRELESS PERSONAL MULTIMEDIA COMMUNICATIONS, VOLS 1-3, PROCEEDINGS, 2002, : 636 - 639
  • [9] Development of a real-time automated monitoring system for managing the hazardous environmental pollutants at the construction site
    Kang, Hyuna
    Sung, Seulki
    Hong, Juwon
    Jung, Seunghoon
    Hong, Taehoon
    Park, Seon
    Lee, Dong-Eun
    [J]. JOURNAL OF HAZARDOUS MATERIALS, 2021, 402
  • [10] Effective of Communication using WhatsApp: Industrialised Building System (IBS) Construction
    Pozin, Mohd Affendi Ahmad
    Nawi, Mohd Nasrun Mohd
    [J]. PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON APPLIED SCIENCE AND TECHNOLOGY (ICAST'18), 2018, 2016