Improved nuclear power plant operations and safety through performance-based safety regulation

被引:9
|
作者
Golay, MW [1 ]
机构
[1] MIT, Dept Nucl Engn, Cambridge, MA 02139 USA
关键词
nuclear power plant; operations and safety; performance-based safety regulation;
D O I
10.1016/S0304-3894(99)00080-1
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper illustrates some of the promise and needed future work for risk-informed, performance-based regulation (RIPER), RIPER is an evolving alternative to the current prescriptive method of nuclear safety regulation. Prescriptive regulation effectively constitutes a long, fragmented checklist of requirements that safety-related systems in a plant must satisfy. RIPER, instead, concentrates upon satisfying negotiated performance goals and incentives for judging and rewarding licensee behavior to improve safety and reduce costs. In a project reported here, a case study was conducted concerning a pressurized water reactor (PWR) emergency diesel generator (EDG). Overall, this work has shown that the methods of RIPER are feasible to use, and capable of justifying simultaneous safety and economic nuclear power improvements. However, it also reveals several areas where the framework of RIPER should be strengthened. First, researchers need better data and understanding regarding individual component-failure modes that may cause components to fail, Not only are more data needed on failure rates, but more data and understanding are needed to enable analysts to evaluate whether these failures become more likely as the interval between tests is increased. This is because the current state of failure data is not sufficiently finely detailed to define the failure rates of individual component failure modes; such knowledge is needed when changing component-specific regulatory requirements. Second, the role of component testing, given that a component has failed, needs to be strengthened within the context of RIPER. This includes formulating requirements fur updating the prior probability distribution of a component failure rate and conducting additional or more frequent testing. Finally, as a means of compensating for unavoidable uncertainty as an obstacle to regulatory decision-making, limits to knowledge must be treated explicitly and formally. This treatment includes the formulation of probabilities through expert solicitation and the review of risk-informed, performance-based and engineering analyses used to evaluate proposed changes to existing technical specifications. (C) 2000 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:219 / 237
页数:19
相关论文
共 50 条
  • [1] Improved nuclear power plant operations through performance-based safety regulation
    Dulik, JD
    Utton, SM
    Golay, MW
    [J]. PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT (PSAM 4), VOLS 1-4, 1998, : 385 - 390
  • [2] Safety Regulation of Nuclear Power Plant License Renewal
    Zhang, Qiaoe
    Liu, Ting
    Qi, Yuan
    Yang, LiLi
    [J]. 2017 3RD INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND MATERIAL APPLICATION (ESMA2017), VOLS 1-4, 2018, 108
  • [3] Fire safety in nuclear power plants: a risk-informed and performance-based approach
    Azarm, Mohamed A.
    Travis, Richard J.
    [J]. SERA, Safety Engineering and Risk Analysis Division, ASME, 1999, 9 : 79 - 85
  • [4] Exploring the relationship between safety culture and safety performance in US nuclear power operations
    Morrow, Stephanie L.
    Koves, G. Kenneth
    Barnes, Valerie E.
    [J]. SAFETY SCIENCE, 2014, 69 : 37 - 47
  • [5] Safety culture in nuclear power operations
    Hickling, N
    [J]. ERGONOMICS, 2003, 46 (12) : 1265 - 1266
  • [6] KOREAN EXPERIENCES IN NUCLEAR-POWER PLANT SAFETY REGULATION
    KANG, BK
    [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1981, 39 : 714 - 715
  • [7] SAFETY GOALS FOR NUCLEAR-POWER PLANT-REGULATION
    LEVINE, S
    STETSON, FT
    [J]. PROGRESS IN NUCLEAR ENERGY, 1986, 17 (02) : 203 - 229
  • [8] Safety goals in 'risk-informed, performance-based' regulation
    Saji, G
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2003, 80 (02) : 163 - 172
  • [9] Assessment of Operating Safety State of Nuclear Power Plant Based on Improved CAE Method
    Lu, Chao
    Ping, Jia-Lin
    Huang, Wei-Jun
    Tan, Ke
    Xie, Hong-Yun
    [J]. NUCLEAR POWER PLANTS: INNOVATIVE TECHNOLOGIES FOR INSTRUMENTATION AND CONTROL SYSTEMS (ISNPP 2019), 2020, 595 : 120 - 128
  • [10] The Performance-Based Fire Protection in the Nuclear Power Plant Design
    Zuo Jiaxu
    Shi Qiang
    Li Juan
    Fu Zhiwei
    Song Wei
    Chen Jiayun
    Zhang Chunming
    Chai Jianshe
    [J]. INTERNATIONAL SYMPOSIUM ON SAFETY SCIENCE AND ENGINEERING IN CHINA, 2012, 2012, 43 : 318 - 323