Long-Term Partnership for Achieving Efficient Capacity Allocation

被引:6
|
作者
Liu, Fang [1 ]
Lewis, Tracy R. [2 ]
Song, Jing-Sheng [2 ]
Kuribko, Nataliya [3 ]
机构
[1] Nanyang Technol Univ, Nanyang Business Sch, Singapore 639672, Singapore
[2] Duke Univ, Fuqua Sch Business, Durham, NC 27708 USA
[3] Stripe, San Francisco, CA 94107 USA
基金
中国国家自然科学基金;
关键词
dynamic mechanism design; capacity allocation; investment; implementation; DYNAMIC MECHANISM; CONTRACTS; DESIGN; RENEGOTIATION; INNOVATION;
D O I
10.1287/opre.2019.1878
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider a capacity provider and a group of independent buyers who partner to share a scarce but expensive-to-build capacity over a finite horizon under privately informed demand conditions. At the beginning of the time horizon, the capacity provider must invest in building capacity; all members may invest in increasing their own and possibly other members' market sizes. Then each member observes and updates its private, history-dependent demand information over time. Because the value of the capacity to each member is highly uncertain when investment is made, achieving the first-best outcome while sustaining under a dynamic environment is challenging for the partnership. We address this issue by proposing a multiperiod membership-type agreement (referred to as the Agreement) as a series of single-period contracts with flexible terms that are renegotiated each period. The Agreement enforces ex post efficient capacity allocation and ex ante efficient investment. The set of interpartner transfers in the Agreement makes each member a residual claimant to the surplus it creates, and hence induces truthful demand reports. This contract is also budget balanced and voluntary. In doing so, we develop a new solution concept for dynamic collective action mechanisms.
引用
收藏
页码:984 / 1001
页数:18
相关论文
共 50 条
  • [1] Long-term partnership
    Cozier, Muriel
    BIOFUELS BIOPRODUCTS & BIOREFINING-BIOFPR, 2014, 8 (06): : 744 - 744
  • [2] Establishing the optimal and efficient capacity re-allocation plans for enhancing the long-term competitiveness of a semiconductor product - a long-term trend viewpoint
    Chen, T.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2010, 224 (B8) : 1295 - 1303
  • [3] Long-term propylene partnership
    不详
    HYDROCARBON PROCESSING, 2003, 82 (06): : 125 - 125
  • [4] HSAS - A PARTNERSHIP IN LONG-TERM CARE
    KATZ, A
    AMERICAN JOURNAL OF PUBLIC HEALTH, 1981, 71 (03) : 315 - 315
  • [5] Achieving long-term surveillance in VigilNet
    He, Tian
    Vicaire, Pascal
    Yan, Ting
    Cao, Qing
    Zhou, Gang
    Gu, Lin
    Luo, Liqian
    Stoleru, Radu
    Stankovic, John A.
    Abdelzaher, Tarek F.
    25TH IEEE INTERNATIONAL CONFERENCE ON COMPUTER COMMUNICATIONS, VOLS 1-7, PROCEEDINGS IEEE INFOCOM 2006, 2006, : 363 - +
  • [6] ACHIEVING SATISFACTION WITH A LONG-TERM SERVICE
    SMITH, LJ
    SMITH, GL
    DEVELOPMENTS IN MARKETING SCIENCE, VOL 12, 1989, : 18 - 22
  • [7] Achieving Long-Term Surveillance in VigilNet
    Vicaire, Pascal
    He, Tian
    Cao, Qing
    Yan, Ting
    Zhou, Gang
    Gu, Lin
    Luo, Liqian
    Stoleru, Radu
    Stankovic, John A.
    Abdelzaher, Tarek F.
    ACM TRANSACTIONS ON SENSOR NETWORKS, 2009, 5 (01)
  • [8] The partnership for long-term care: Who are the partnership policy purchasers?
    McCall, N
    Driver, S
    Bauer, E
    Knickman, J
    MEDICAL CARE RESEARCH AND REVIEW, 1997, 54 (04) : 472 - 489
  • [9] Capacity Payment for Long-Term Security of Supply and Allocation of Optimal System Reserve
    Zendehdel, Mohammad Hossein
    2014 5TH CONFERENCE ON THERMAL POWER PLANTS (CTPP), 2014, : 123 - 126
  • [10] Long-term partnership formation: Marriage and employment
    Burdett, K
    Coles, MG
    ECONOMIC JOURNAL, 1999, 109 (456): : F307 - F334