Study on internal force effect of a high-speed rail (40+56+40) m prestressed concrete continuous beam bridge

被引:0
|
作者
Zhao, Yongming [1 ]
机构
[1] Southwest Jiaotong Univ, Sch Civil Engn, Chengdu 610031, Sichuan, Peoples R China
关键词
Prestressed concrete; Continuous beam; Internal force effect; Dead load; Live load;
D O I
10.4028/www.scientific.net/AMR.859.228
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The continuous beam bridge is a kind of bridge type used widely on the project. With the design theory and construction technology, prestressed concrete continuous beam bridge shown strong vitality. This design is a high-speed rail (40+56+40) m prestressed concrete continuous beam bridge design, whose width is 12.2m and its maximum Design speed is 300km/h. The form of the railway is double line which is 4.8m far away, and the cross-sectional slope is 2%.ZK load was applied on the bridge. A three-span P.C continuous Beam structure with variable cross-section is used in this bridge. The girder body adopts single cell and single box, the height of beam takes quadratic parabola relation, which is 5m high at the middle fulcrum, while at the side fulcrum and the mid-span is 2.5m. The design uses Midas/Civil to establish the fmite element model that is reasonable and simple, analyzing the structure behavior of the girder body under loading, especially the internal forces of bridge structure under dead load, live load and additional force.
引用
收藏
页码:228 / 232
页数:5
相关论文
共 18 条
  • [1] RESERCH ON HIGH-SPEED RAIL PRESTRESSED CONCRETE CONTINUOUS BEAM BRIDGE DESIGN DEFORMATION
    Zhang, Nan
    Lei, Junqing
    Zhang, Kun
    [J]. NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 825 - 828
  • [2] STUDY ON TEMPERATURE AND CREEP EFFECTFOR HIGH-SPEED RAILWAY PRESTRESSED CONCRETE BEAM BRIDGE
    Lei, Junqing
    Xue, Yuguang
    Xue, Zhaojun
    [J]. CONSTRUCTION AND MAINTENANCE OF RAILWAY INFRASTRUCTURE IN COMPLEX ENVIRONMENT, 2014, : 559 - 564
  • [3] Calculation on internal force effect of a high-speed highwayprestressed concrete Extra-dosed cable-stayed bridge
    Chen, Xingzhou
    [J]. ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 3154 - 3157
  • [4] Experimental study on flexural behavior of new type of prestressed reactive powder concrete sound barrier for high-speed rail
    Cao, Xia
    Yang, Zhen-Xuan
    Zhu, Wan-Xu
    Peng, Han-Ze
    Fu, Feng
    Wang, Long
    Qian, Kai
    [J]. STRUCTURAL CONCRETE, 2021, 22 (02) : 623 - 636
  • [5] Research on Dynamic Behaviors of 32m Prestressed Concrete Simply Supported Box Beam in High-speed Railway
    Yao, Jingchuan
    Yang, Yiqian
    Liu, Penghui
    Wang, Wei
    [J]. ADVANCES IN ENVIRONMENTAL VIBRATION, 2011, : 446 - 453
  • [6] Dynamic Analysis of 40 m-Long Simply-Supported Spans for High-Speed Railway Bridge
    高速铁路40 m简支箱梁动力响应分析
    [J]. 1600, Wuhan Bridge Research Institute (50): : 78 - 83
  • [7] The Experimental Study on Internal Force Redistribution of High Strength Steel-High Strength Concrete Continuous Composite Beam
    Shi, QiYin
    Meng, QiuWei
    [J]. ADVANCED RESEARCH ON CIVIL ENGINEERING, MATERIALS ENGINEERING AND APPLIED TECHNOLOGY, 2014, 859 : 304 - 308
  • [8] Calculation of Bursting Force at the Beam End of 40 m Box Girder Used for High-Speed Railway Based on Statically Determinate Strut-and-Tie Model
    Jiang X.
    Zhang Z.
    Hu S.
    Ban X.
    Su Y.
    Guo J.
    [J]. Zhongguo Tiedao Kexue/China Railway Science, 2022, 43 (05): : 23 - 29
  • [9] Influence of friction effect of sliding bearing on track-bridge interaction between continuous welded rail and long-span bridge in high-speed railway
    Liu W.
    Dai G.
    Qin H.
    [J]. Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2019, 50 (03): : 627 - 633
  • [10] Study of pounding effect of high-speed railway simply-supported beam bridge considering track constraint
    Yan, Bin
    Dai, Gong-Lian
    Su, Miao
    [J]. 1600, Wuhan Bridge Research Institute (44): : 24 - 28