A hybrid genetic algorithm for multi-objective flexible job shop scheduling problem considering transportation time

被引:28
|
作者
Huang, Xiabao [1 ,2 ]
Yang, Lixi [3 ]
机构
[1] Fujian Jiangxia Univ, Fuzhou, Fujian, Peoples R China
[2] Huazhong Univ Sci & Technol, Sch Mech Sci & Engn, Dalian, Peoples R China
[3] Fuzhou Univ, Sch Econ & Management, Management Sci, Fuzhou, Fujian, Peoples R China
关键词
Flexible job-shop scheduling problem; Transportation time; Genetic algorithm; Simulated annealing; Multi-objective optimization; TABU SEARCH; OPTIMIZATION;
D O I
10.1108/IJICC-10-2018-0136
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
Purpose Flexible job-shop scheduling is significant for different manufacturing industries nowadays. Moreover, consideration of transportation time during scheduling makes it more practical and useful. The purpose of this paper is to investigate multi-objective flexible job-shop scheduling problem (MOFJSP) considering transportation time. Design/methodology/approach A hybrid genetic algorithm (GA) approach is integrated with simulated annealing to solve the MOFJSP considering transportation time, and an external elitism memory library is employed as a knowledge library to direct GA search into the region of better performance. Findings The performance of the proposed algorithm is tested on different MOFJSP taken from literature. Experimental results show that proposed algorithm performs better than the original GA in terms of quality of solution and distribution of the solution, especially when the number of jobs and the flexibility of the machine increase. Originality/value Most of existing studies have not considered the transportation time during scheduling of jobs. The transportation time is significantly desired to be included in the FJSP when the time of transportation of jobs has significant impact on the completion time of jobs. Meanwhile, GA is one of primary algorithms extensively used to address MOFJSP in literature. However, to solve the MOFJSP, the original GA has a possibility to get a premature convergence and it has a slow convergence speed. To overcome these problems, a new hybrid GA is developed in this paper.
引用
收藏
页码:154 / 174
页数:21
相关论文
共 50 条
  • [1] The Improved Genetic Algorithm for Multi-objective Flexible Job Shop Scheduling Problem
    Yang, Jian Jun
    Ju, Lu Yan
    Liu, Bao Ye
    [J]. MECHANICAL, MATERIALS AND MANUFACTURING ENGINEERING, PTS 1-3, 2011, 66-68 : 870 - 875
  • [2] A hybrid algorithm for multi-objective job shop scheduling problem
    Li, Junqing
    Pan, Quanke
    Xie, Shengxian
    Gao, Kaizhou
    Wang, Yuting
    [J]. 2011 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, 2011, : 3630 - 3634
  • [3] An effective hybrid algorithm for multi-objective flexible job-shop scheduling problem
    Huang, Xiabao
    Guan, Zailin
    Yang, Lixi
    [J]. ADVANCES IN MECHANICAL ENGINEERING, 2018, 10 (09):
  • [4] An Improved Genetic Algorithm for Multi-objective Flexible Job-shop Scheduling Problem
    Zhang, Chaoyong
    Wang, Xiaojuan
    Gao, Liang
    [J]. MANUFACTURING SCIENCE AND ENGINEERING, PTS 1-5, 2010, 97-101 : 2449 - 2454
  • [5] A multi-objective genetic algorithm for fuzzy flexible job-shop scheduling problem
    Wang, Xiaojuan
    Gao, Liang
    Zhang, Chaoyong
    Li, Xinyu
    [J]. INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 2012, 45 (2-3) : 115 - 125
  • [6] Immune Genetic Algorithm for Multi-objective Flexible Job-shop Scheduling Problem
    Ren, Huizhi
    Xu, Han
    Sun, Shenshen
    [J]. PROCEEDINGS OF THE 28TH CHINESE CONTROL AND DECISION CONFERENCE (2016 CCDC), 2016, : 2167 - 2171
  • [7] A Memetic Algorithm for the Multi-Objective Flexible Job Shop Scheduling Problem
    Yuan, Yuan
    Xu, Hua
    [J]. GECCO'13: PROCEEDINGS OF THE 2013 GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE, 2013, : 559 - 566
  • [8] A hybrid multi-objective genetic algorithm based on the ELECTRE method for a capacitated flexible job shop scheduling problem
    Mohamad Rohaninejad
    Amirsaman Kheirkhah
    Parviz Fattahi
    Behdin Vahedi-Nouri
    [J]. The International Journal of Advanced Manufacturing Technology, 2015, 77 : 51 - 66
  • [9] A hybrid multi-objective genetic algorithm based on the ELECTRE method for a capacitated flexible job shop scheduling problem
    Rohaninejad, Mohamad
    Kheirkhah, Amirsaman
    Fattahi, Parviz
    Vahedi-Nouri, Behdin
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 77 (1-4): : 51 - 66
  • [10] An improved multi-objective genetic algorithm for fuzzy flexible job-shop scheduling problem
    Wang, Xiaojuan
    Li, Wenfeng
    Zhang, Ying
    [J]. INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 2013, 47 (2-3) : 280 - 288