On single machine scheduling with resource constraint

被引:3
|
作者
Wu, Lidong [1 ]
Cheng, Cong-Dian [2 ]
机构
[1] Univ Texas Dallas, Dept Comp Sci, Richardson, TX 75080 USA
[2] Shenyang Normal Univ, Coll Math & Syst Sci, Shenyang 110034, Peoples R China
关键词
Scheduling; Resource constraint; Weighted flow time; Approximation algorithm; Error bound;
D O I
10.1007/s10878-014-9721-5
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The single machine scheduling with resource constraint is a nonlinear combinatorial optimization problem in cloud computing applications. Given a set of jobs and certain resource, the problem is to find a permutation of jobs and a distribution of resource to optimize certain objective function. The processing time of each job is a nonlinear function with respect to the resource assigned to it. In this paper, we propose a naive algorithm and study a subproblem in the algorithm that suppose the permutation of jobs is also given, how to find a resource distribution to minimize the total weighted flow time. We found a polynomial-time optimal solution for a special case and an approximation solution in general case.
引用
收藏
页码:491 / 505
页数:15
相关论文
共 50 条
  • [1] On single machine scheduling with resource constraint
    Lidong Wu
    Cong-Dian Cheng
    [J]. Journal of Combinatorial Optimization, 2016, 31 : 491 - 505
  • [2] Uniform parallel machine scheduling with resource consumption constraint
    Yeh, Wei-Chang
    Chuang, Mei-Chi
    Lee, Wen-Chiung
    [J]. APPLIED MATHEMATICAL MODELLING, 2015, 39 (08) : 2131 - 2138
  • [3] Single Machine Scheduling with an Availability Constraint and Rejection
    Zhao, Chuanli
    Tang, Hengyong
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2014, 31 (05)
  • [4] Two-agent single-machine scheduling to minimize resource consumption with a constraint on the makespan
    Liu, Peng P
    Tian, Xiaoyu
    [J]. PROCEEDINGS OF 2013 6TH INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING (ICIII 2013) VOL 1, 2013, : 487 - 489
  • [5] A NEW HEURISTIC FOR PROJECT SCHEDULING WITH A SINGLE RESOURCE CONSTRAINT
    KHATTAB, M
    CHOOBINEH, F
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1991, 20 (03) : 381 - 387
  • [6] A NEW HEURISTIC FOR PROJECT SCHEDULING WITH A SINGLE RESOURCE CONSTRAINT
    KHATTAB, M
    CHOOBINEH, F
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1990, 19 (1-4) : 514 - 518
  • [7] Algorithms for the unrelated parallel machine scheduling problem with a resource constraint
    Fleszar, Krzysztof
    Hindi, Khalil S.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 271 (03) : 839 - 848
  • [8] Single-machine scheduling with an external resource
    Briskorn, Dirk
    Davari, Morteza
    Matuschke, Jannik
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 293 (02) : 457 - 468
  • [9] Single-machine scheduling under the job rejection constraint
    Zhang, Liqi
    Lu, Lingfa
    Yuan, Jinjiang
    [J]. THEORETICAL COMPUTER SCIENCE, 2010, 411 (16-18) : 1877 - 1882
  • [10] Scheduling linear deteriorating jobs with an availability constraint on a single machine
    Ji, Min
    He, Yong
    Cheng, T. C. E.
    [J]. THEORETICAL COMPUTER SCIENCE, 2006, 362 (1-3) : 115 - 126