Benefits of implementing Six Sigma in competitive tendering process

被引:1
|
作者
Ottou, Jemima Antwiwaa [1 ]
Baiden, Bernard Kofi [2 ]
Nani, Gabriel [2 ]
Tuuli, Martin Morgan [1 ]
机构
[1] Ghana Inst Management & Publ Adm GIMPA, Business Sch, Dept Management Sci, Accra, Ghana
[2] Kwame Nkrumah Univ Sci & Technol, Dept Construct Technol & Management, Kumasi, Ghana
关键词
Benefits; Challenges; Competitive tendering; Construction; Delays; Six sigma; HIGHER-EDUCATION; IMPROVEMENT; PROJECTS;
D O I
10.1108/BEPAM-07-2020-0117
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Purpose This research investigates the implementation of Six Sigma in competitive tendering processes to address persistent delays by identifying the potential benefits and challenges of implementing Six Sigma in construction competitive tendering processes. The results seek to encourage practitioners to implement Six Sigma in addressing competitive tendering process delays. Design/methodology/approach Literature was reviewed to identify the benefits and challenges of Six Sigma implementation in construction processes and categorized under broad headings. Three case studies were used to authenticate the literature findings by applying Define-Measure-Analyse-Improve-Control to their construction competitive tendering processes. Furthermore, quality tools and techniques together with documentary analysis, content analysis and determination of frequencies of quantitised qualitative data were employed to identify potential benefits and challenges. Findings The most common Six Sigma benefits achievable in construction competitive tendering are Time Related benefits. Other benefits likely to emanate as ripple effects are Customer Focus Related, Quality Related, Process Improvement Related, Human Resource Related, Finance Related and Decision Related. However, implementation challenges should be expected. Practical implications Six Sigma implementation in construction competitive tendering promotes time efficiency. It is expected that this will encourage quantity surveyors, procurement practitioners and their institutions to implement Six Sigma in addressing persistent delays in their competitive tendering processes. Originality/value This paper demonstrates the use of merged approach under mixed method to identify the benefits and challenges of Six Sigma implementation in construction competitive tendering process within the Ghanaian context.
引用
收藏
页码:214 / 230
页数:17
相关论文
共 50 条
  • [1] Six steps of implementing Six Sigma in a management process
    Yang, XH
    [J]. ICIM' 2002: PROCEEDINGS OF THE SIXTH CHINA-JAPAN INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2002, : 41 - 45
  • [2] IMPLEMENTING SIX SIGMA TO IMPROVE HOSPITAL DISCHARGE PROCESS
    Udayai, Kirti
    Kumar, Piyush
    [J]. INTERNATIONAL JOURNAL OF PHARMACEUTICAL SCIENCES AND RESEARCH, 2012, 3 (11): : 4528 - 4532
  • [3] The research on Process capability Improvement by Implementing Six Sigma
    Sui Lihui
    Cui Youxiang
    [J]. STATISTIC APPLICATION IN MODERN SOCIETY, 2015, : 431 - 440
  • [4] THE PROCESS TO ESTIMATE ECONOMICAL BENEFITS OF SIX SIGMA PROJECTS
    Kosina, Jan
    [J]. QUALITY INNOVATION PROSPERITY-KVALITA INOVACIA PROSPERITA, 2013, 17 (01): : 16 - 27
  • [5] Implementing Six Sigma in The Netherlands
    van den Heuvel, Jaap
    Does, Ronald J. M. M.
    Bogers, Ad J. J. C.
    Berg, Marc
    [J]. JOINT COMMISSION JOURNAL ON QUALITY AND PATIENT SAFETY, 2006, 32 (07): : 393 - 399
  • [6] Implementing the six sigma solution
    Blakeslee, JA
    [J]. QUALITY PROGRESS, 1999, 32 (07) : 77 - 85
  • [7] Six sigma and competitive advantage
    de Mast, J
    [J]. TOTAL QUALITY MANAGEMENT & BUSINESS EXCELLENCE, 2006, 17 (04) : 455 - 464
  • [8] Implementing and applying Six Sigma in construction
    Pheng, LS
    Hui, MS
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (04) : 482 - 489
  • [9] Implementing six sigma in R&D
    Studt, T
    [J]. R&D MAGAZINE, 2002, 44 (08): : 21 - 23
  • [10] Implementing Six Sigma in a Distance Learning Application
    Gammoh, Diala Tawfig
    Elshennawy, Ahmad K.
    Ducharme, Alfred
    [J]. INTERNATIONAL JOURNAL OF ONLINE ENGINEERING, 2009, 5 (02) : 23 - 29