Optimizing Agile Processes by Early Identification of Hidden Requirements

被引:0
|
作者
Yaguee, Agustin [1 ]
Rodriguez, Pilar [1 ]
Garbajosa, Juan [1 ]
机构
[1] Tech Univ Madrid UPM, SYST Res Grp, EU Informat, E-28031 Madrid, Spain
关键词
D O I
暂无
中图分类号
TP31 [计算机软件];
学科分类号
081202 ; 0835 ;
摘要
In recent years, Agile methodologies have increased their relevance in software development, through the application of different testing techniques like unit or acceptance testing. Tests play in agile methodologies a similar role that in waterfall process models: check conformance. Nevertheless the scenario is not the same The contribution of this paper is to explain how the process can be modified to do early identification of hidden requirements (HR) using testing techniques in agile methodologies, specifically using failed tests. The result is an optimized agile process where it may be possible to reach the desired level of functionality in less iterations, but with a similar level of quality. Furthermore it might be necessary to re-think process elements role, e.g. tests, in the Agile context not assuming waterfall definition and scope.
引用
收藏
页码:180 / 185
页数:6
相关论文
共 50 条
  • [1] Automatic requirements elicitation in agile processes
    Ankori, R
    [J]. IEEE INTERNATIONAL CONFERENCE ON SOFTWARE - SCIENCE, TECHNOLOGY AND ENGINEERING, PROCEEDINGS, 2005, : 101 - 109
  • [2] Hidden skills that support phased and agile requirements engineering
    Ben Kovitz
    [J]. Requirements Engineering, 2003, 8 (2) : 135 - 141
  • [3] Tag oriented agile requirements identification
    Connolly, David
    Keenan, Frank
    Ryder, Brendan
    [J]. FIFTEENTH IEEE INTERNATIONAL CONFERENCE AND WORKSHOPS ON THE ENGINEERING OF COMPUTER-BASED SYSTEMS, PROCEEDINGS, 2008, : 497 - 498
  • [4] Requirements towards optimizing analytics in industrial processes
    Zeiser, Alexander
    van Stein, Bas
    Back, Thomas
    [J]. 12TH INTERNATIONAL CONFERENCE ON AMBIENT SYSTEMS, NETWORKS AND TECHNOLOGIES (ANT) / THE 4TH INTERNATIONAL CONFERENCE ON EMERGING DATA AND INDUSTRY 4.0 (EDI40) / AFFILIATED WORKSHOPS, 2021, 184 : 597 - 605
  • [5] Visualization and Scheduling of Non-functional Requirements for Agile Processes
    Farid, Weam M.
    Mitropoulos, Frank J.
    [J]. 2013 PROCEEDINGS OF IEEE SOUTHEASTCON, 2013,
  • [6] Survey on Differences of Requirements Engineering for Traditional and Agile Development Processes
    Alhazmi, Alhejab
    Huang, Shihong
    [J]. IEEE SOUTHEASTCON 2020, 2020,
  • [7] NORPLAN: Non-functional Requirements Planning for Agile Processes
    Farid, Weam M.
    Mitropoulos, Frank J.
    [J]. 2013 PROCEEDINGS OF IEEE SOUTHEASTCON, 2013,
  • [8] Comparing Agile Software Processes Based on the Software Development Project Requirements
    Qasaimeh, Malik
    Mehrfard, Hossein
    Hamou-Lhadj, Abdelwahab
    [J]. 2008 INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE FOR MODELLING CONTROL & AUTOMATION, VOLS 1 AND 2, 2008, : 49 - 54
  • [9] EARLY IDENTIFICATION OF ACCESS REQUIREMENTS
    SILVA, JP
    [J]. PROCEEDINGS ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 1981, (NSYM): : 44 - 50
  • [10] NORMATIC: A Visual Tool for Modeling Non-functional Requirements in Agile Processes
    Farid, Weam M.
    Mitropoulos, Frank J.
    [J]. 2012 PROCEEDINGS OF IEEE SOUTHEASTCON, 2012,