An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem

被引:41
|
作者
Capacho, Liliana [1 ,2 ,3 ]
Pastor, Rafael [1 ]
Dolgui, Alexander [4 ]
Guschinskaya, Olga [4 ]
机构
[1] Univ Politecn Cataluna, ETS Ingn Ind Barcelona, Inst Org & Control Sistemas Ind, E-08028 Barcelona, Spain
[2] Univ Los Andes, IO Dept, EISULA, Merida, Venezuela
[3] Univ Los Andes, IO Dept, CESIMO, Merida, Venezuela
[4] Ecole Mines, Div Ind Engn & Comp Sci, St Etienne, France
关键词
Assembly line balancing; PROCESSING ALTERNATIVES; ALGORITHMS; SELECTION; DESIGN; MODEL; TIME;
D O I
10.1007/s10732-007-9063-x
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper evaluates a set of constructive heuristic methods developed to solve the novel Alternative Subgraphs Assembly Line Balancing Problem (ASALBP), which considers variants for different parts of a production or manufacturing process. Each variant is represented by a precedence subgraph that defines the tasks to be performed and their processing times. The proposed methods use priority rules and random choice to select the assembly subgraphs and to assign the tasks to the stations in order to minimize the number of required workstations. The methods are evaluated by a computational experiment based on medium- and large-scale benchmark problems.
引用
收藏
页码:109 / 132
页数:24
相关论文
共 50 条
  • [1] An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem
    Liliana Capacho
    Rafael Pastor
    Alexander Dolgui
    Olga Guschinskaya
    [J]. Journal of Heuristics, 2009, 15 : 109 - 132
  • [2] Heuristic methods to solve the alternative subgraphs assembly line balancing problem
    Capacho, Liliana
    Pastor, Rafael
    Guschinskaya, Olga
    Dolgui, Alexandre
    [J]. 2006 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING, VOLS 1 AND 2, 2006, : 501 - +
  • [3] Optimally solving the alternative subgraphs assembly line balancing problem
    Armin Scholl
    Nils Boysen
    Malte Fliedner
    [J]. Annals of Operations Research, 2009, 172 : 243 - 258
  • [4] Optimally solving the alternative subgraphs assembly line balancing problem
    Scholl, Armin
    Boysen, Nils
    Fliedner, Malte
    [J]. ANNALS OF OPERATIONS RESEARCH, 2009, 172 (01) : 243 - 258
  • [5] Exact and heuristic methods for solving the Robotic Assembly Line Balancing Problem
    Borba, Leonardo
    Ritt, Marcus
    Miralles, Cristobal
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 270 (01) : 146 - 156
  • [6] ASALBP: the alternative subgraphs assembly line balancing problem
    Capacho, Liliana
    Pastor, Rafael
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (13) : 3503 - 3516
  • [7] Heuristic procedures for solving the general assembly line balancing problem with setups
    Martino, Luigi
    Pastor, Rafael
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (06) : 1787 - 1804
  • [8] An enumerative heuristic and reduction methods for the assembly line balancing problem
    Fleszar, K
    Hindi, KS
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 145 (03) : 606 - 620
  • [9] Alternative subgraphs assembly line balancing problem with resource selection and parallel stations
    Leiber, Daria
    Vuong, Anh-Tu
    Reinhart, Gunther
    [J]. ENGINEERING OPTIMIZATION, 2022, 54 (11) : 1903 - 1918
  • [10] Alternative subgraphs assembly line balancing problem with resource selection and parallel stations
    Leiber, Daria
    Vuong, Anh-Tu
    Reinhart, Gunther
    [J]. Engineering Optimization, 2022, 54 (11): : 1903 - 1918