HSE Risk Assessment of Major Sewage Transport Tunnel Projects at the Construction Stage Based on the StructuralEntropy Weight Method and the Cloud Model

被引:6
|
作者
Wu, Han [1 ]
Liu, Sen [1 ]
Liu, Denghui [2 ]
Wang, Junwu [1 ]
机构
[1] Wuhan Univ Technol, Sch Civil Engn & Architecture, Wuhan 430070, Peoples R China
[2] China Construct First Grp Corp Ltd, Beijing 100161, Peoples R China
基金
国家重点研发计划;
关键词
CHINA; IDENTIFICATION; MANAGEMENT; IMPACT;
D O I
10.1155/2020/8882903
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The health, safety, and environment (HSE) risk assessment of major sewage transport tunnel projects (MSTTPs) is of great significance to guarantee sewage treatment, ecological environment protection, and sustainable development. To accurately evaluate the HSE risk of MSTTPs at the construction stage and effectively deal with their randomness and ambiguity, a risk assessment model based on the structural entropy weight method (SEWM) and the cloud model is put forward in this paper. First, an index system for MSTTPs was constructed via a literature review and expert interviews, and the rough sets method was used to filter the indicators. Then, weights were calculated by the SEWM, which is able to consider both subjective and objective factors of the weight calculation. Finally, to clarify the randomness and ambiguity in the evaluation, the HSE risk level was determined by the cloud similarity. The model was applied to the Donghu Deep Tunnel Project in Wuhan, China, and the results demonstrated that its HSE risk level was medium, which was acceptable. The index related to construction safety had the largest weight. A humid environment, improper power utilization, and sludge and mud pollution were found to be the most influential risk indicators. The risk level could be intuitively and qualitatively judged by the figure evaluation cloud, providing a vivid and rapid evaluation tool for the emergency decision-making of project managers, and the risk level could be quantitatively judged by the calculation of cloud similarity. Moreover, through the comparison with gray correlation degree, set pair analysis, and fuzzy comprehensive evaluation method evaluation results, we prove the scientificity and effectiveness of the proposed model. The research results provide a valuable reference for the project management of MSTTPs at the construction stage.
引用
收藏
页数:12
相关论文
共 50 条
  • [1] Risk Assessment of Tunnel Construction Based on Improved Cloud Model
    Lin, C. J.
    Zhang, M.
    Li, L. P.
    Zhou, Z. Q.
    Liu, S.
    Liu, C.
    Li, T.
    [J]. JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2020, 34 (03)
  • [2] Risk Assessment Based on Combined Weighting-Cloud Model of Tunnel Construction
    Wang, Jing-chun
    Liu, Jia-qi
    Wei, Qiang
    Wang, Peng
    [J]. TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2021, 28 (01): : 203 - 210
  • [3] Risk Assessment to Major Tunnel Construction Based on TFCE
    Qu Zhiming
    Gong Sheqiang
    [J]. PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON RISK MANAGEMENT & ENGINEERING MANAGEMENT, VOLS 1 AND 2, 2008, : 206 - 209
  • [4] Bridge Construction Risk Assessment Based on Variable Weight Theory and Cloud Model
    Yao, Bo
    Wang, Lianguang
    Gao, Haiyang
    Ren, Lijie
    [J]. BUILDINGS, 2024, 14 (03)
  • [5] Expressway Tunnel Operation Risk Assessment Model Based on Improved Critic Method and Cloud Model
    Li, Kailun
    Liu, Xuan
    Xiao, Dianliang
    Zhang, Dongxu
    Ye, Sai
    [J]. CICTP 2021: ADVANCED TRANSPORTATION, ENHANCED CONNECTION, 2021, : 1063 - 1071
  • [6] Risk Comprehensive Assessment of Shield Tunnel Construction Based on Cloud Theory
    Fu, Helin
    Huang, Zhen
    Zhang, Jiabing
    [J]. GEO-RISK 2017: GEOTECHNICAL RISK ASSESSMENT AND MANAGEMENT, 2017, (285): : 334 - 345
  • [7] Risk Assessment of Shield Tunnel Construction in Karst Strata Based on Fuzzy Analytic Hierarchy Process and Cloud Model
    Meng, Guowang
    Ye, Yangchun
    Wu, Bo
    Luo, Guijun
    Zhang, Xu
    Zhou, Zhiqiang
    Sun, Wentao
    [J]. SHOCK AND VIBRATION, 2021, 2021
  • [8] Risk Analysis of Construction Stage of Shield Tunneling Projects Based on Dependability Method
    Zhou Jian
    Zhang Jiao
    Zhang Jian
    [J]. PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL VII, PTS A AND B, 2008, 7 : 238 - 241
  • [9] A Schedule Risk Assessment Model of Construction Projects Based on Bayesian Network
    Liu Zheng
    Ma Guofeng
    [J]. PROCEEDINGS OF THE 2011 INTERNATIONAL CONFERENCE ON ENGINEERING AND RISK MANAGEMENT, 2011, : 106 - 111
  • [10] Risk Assessment of Water Environment Treatment PPP Projects Based on a Cloud Model
    Zhang, Yaqiong
    He, Nan
    Li, Yijing
    Chen, Yiyang
    Wang, Lei
    Ran, Yunlong
    [J]. DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2021, 2021