Using quality tools from LEAN manufacturing to evaluate pretransfusion work processes

被引:0
|
作者
Bonomo, P.
Criscione, R.
South, S. F.
Malomgre, W.
机构
[1] Azienda Osped Civilel Ragusa, Ragusa, Italy
[2] Orthoclin Diagnost, Scottsdale, AZ USA
[3] Orthoclin Diagnost, Beerse, Belgium
关键词
D O I
暂无
中图分类号
R5 [内科学];
学科分类号
1002 ; 100201 ;
摘要
引用
收藏
页码:219A / 220A
页数:2
相关论文
共 50 条
  • [1] Using new quality tools from LEAN manufacturing to evaluate pretransfusion testing work processes
    Bonomo, P.
    South, S.
    Malomgre, W.
    Criscione, C.
    [J]. VOX SANGUINIS, 2006, 91 : 271 - 271
  • [2] Results in applying LEAN quality tools to pretransfusion testing processes in a large metropolitan hospital in Italy
    Bulla, A.
    Curti, F.
    South, S.
    Malomgre, W.
    [J]. VOX SANGUINIS, 2006, 91 : 271 - 272
  • [3] Using non-traditional quality tools to evaluate automation for pretransfusion testing
    South, F.
    Casina, T.
    Malomgre, W.
    [J]. VOX SANGUINIS, 2006, 91 : 132 - 133
  • [4] DIAGNOSTICS OF PRODUCTION PROCESSES USING SELECTED LEAN MANUFACTURING TOOLS
    Sobczuk, Sebastian
    Liniewski, Jakub
    Borucka, Anna
    [J]. Diagnostyka, 2024, 25 (03):
  • [5] Results in applying LEAN quality tools to pretransfusion testing in a large metropolitan hospital in Italy
    Bulla, A.
    Curti, F.
    South, S. F.
    Malomgre, W.
    [J]. TRANSFUSION, 2006, 46 (09) : 220A - 220A
  • [6] THE USE OF LEAN MANUFACTURING TOOLS TO IMPROVEMENT OF LOGISTIC PROCESSES
    Furman, Joanna
    Kuczynska-Chalada, Marzena
    [J]. 8TH CARPATHIAN LOGISTICS CONGRESS (CLC 2018), 2019, : 450 - 455
  • [7] PROCESS IMPROVEMENT IDENTIFIED IN HKRCBTS QUALITY CONTROL LABORATORY WITH QUALITY TOOLS FROM LEAN MANUFACTURING
    Wong, A.
    Chan, B.
    Yuen, M.
    Liu, G.
    Lin, C. K.
    Cheng, S.
    [J]. VOX SANGUINIS, 2011, 101 : 46 - 47
  • [8] Waste Reduction Using Lean Manufacturing Tools: A Case in the Manufacturing of Bricks
    Arevalo-Barrera, B. C.
    Parreno-Marcos, F. E.
    Quiroz-Flores, J. C.
    Alvarez-Merinos, J. C.
    [J]. 2019 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2019, : 1285 - 1289
  • [9] Using LEAN tools to assess work processes in a large transfusion service before implementing automation
    Dada, A.
    South, S.
    Casina, T.
    [J]. VOX SANGUINIS, 2006, 91 : 272 - 272
  • [10] Using LEAN tools to assess work processes in a large transfusion service before implementing automation
    Dada, A.
    South, S. F.
    Casina, T. S.
    [J]. TRANSFUSION, 2006, 46 (09) : 219A - 219A