Construction Delay Analysis and Early Warning Model Based on Design Structure Matrix

被引:0
|
作者
Liu, Deyin [1 ]
Chen, Jianguo [1 ]
机构
[1] Tongji Univ, Sch Econ & Management, Shanghai, Peoples R China
关键词
schedule management; delay analysis; early warning; DSM;
D O I
10.4028/www.scientific.net/AMM.357-360.2199
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Schedule delays frequently occur in construction projects and bring unexpected consequence. Conducting an elaborate delay analysis and providing early warning are crucial for project performance. In this paper, factors are classified into internal risks and external risks based on the "chain effect" of schedule delays, and the design structure matrix (DSM) is employed to develop the delay analysis and early warning model. Case study has been performed to prove the effectiveness of the proposed model, finally, sensitivity analysis also draws conclusion the internal risks between tasks should be paid more attention than the external in environment.
引用
收藏
页码:2199 / 2206
页数:8
相关论文
共 50 条
  • [1] Construction of Enterprise Financial Early Warning Model Based on Intelligent Mathematical Model
    Cheng, Jing
    Lu, Xiaofan
    Zhang, Xionggang
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2022, 2022
  • [2] Construction and Optimization of University Financial Risk Early Warning Model Based on Big Data Analysis
    Zhang, Tianmeng
    PROCEEDINGS OF 2024 INTERNATIONAL CONFERENCE ON MACHINE INTELLIGENCE AND DIGITAL APPLICATIONS, MIDA2024, 2024, : 182 - 187
  • [3] Construction of Safety Early Warning Model for Construction of Engineering Based on Convolution Neural Network
    Zhao, Changge
    COMPUTATIONAL INTELLIGENCE AND NEUROSCIENCE, 2022, 2022
  • [4] Construction of Early Warning Model of Geological Disasters Based on Data Mining
    Wang, Ying
    Yang, XianBin
    2022 6TH INTERNATIONAL SYMPOSIUM ON COMPUTER SCIENCE AND INTELLIGENT CONTROL, ISCSIC, 2022, : 107 - 111
  • [5] Early warning model of flight delay based on SVM with incorporated prior knowledge
    Chen, Haiyan
    Wang, Jiandong
    Gu, Bin
    Nanjing Hangkong Hangtian Daxue Xuebao/Journal of Nanjing University of Aeronautics and Astronautics, 2009, 41 (02): : 243 - 247
  • [6] The Construction and Empirical Analysis of the Company's Financial Early Warning Model Based on Data Mining Algorithms
    Wang, Aiqun
    Yu, Hongxiang
    JOURNAL OF MATHEMATICS, 2022, 2022
  • [7] Application of Axiomatic Design and Design Structure Matrix for Early Identification of Changes in Construction Projects
    Padala S.P.S.
    Journal of The Institution of Engineers (India): Series A, 2022, 103 (02) : 647 - 661
  • [8] Construction and evaluation of financial distress early warning model based on machine learning
    Gao, Li
    JOURNAL OF ELECTRICAL SYSTEMS, 2024, 20 (03) : 315 - 327
  • [9] Construction and application of financial fraud early warning model based on Data Mining
    Qin, Teng
    Cheng, Guanghua
    Wang, Ziwei
    2ND INTERNATIONAL CONFERENCE ON APPLIED MATHEMATICS, MODELLING, AND INTELLIGENT COMPUTING (CAMMIC 2022), 2022, 12259
  • [10] Research on The Construction of Corruption Early Warning Mining Model Based on Big Data
    Cao, Qi
    Zhang, Yaowen
    2022 INTERNATIONAL CONFERENCE ON BIG DATA, INFORMATION AND COMPUTER NETWORK (BDICN 2022), 2022, : 132 - 138