Semi-automated deployment of Simulation-aided Building Controls

被引:0
|
作者
Leal, Sergio [1 ]
Dubisch, Florian [1 ]
Stift, Florian [1 ]
Zucker, Gerhard [1 ]
Palensky, Peter [1 ]
机构
[1] Austrian Inst Technol, Dept Energy, Vienna, Austria
关键词
SYSTEMS;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The deployment of Simulation-aided Building Controls is a complex process due to the uniqueness of each building along with an increasing complexity of building systems. Typically the deployment tasks are performed manually by highly specialized personnel which results in a poorly documented and extremely scattered deployment process. This paper introduces a workflow for the deployment of a Simulation-aided Building Control service suitable for supporting the operation phase of a building. Some tasks in the deployment process may benefit from machine support, especially data intensive, repetitive and error prone tasks. These may be fully or semi-automated. The proposed approach reduces the complexity of the setup procedure, decreases problems related to the uniqueness of the infrastructure and supports the documentation of the deployment process. Specially large facility management service providers may profit from this deployment process.
引用
收藏
页码:5747 / 5754
页数:8
相关论文
共 50 条
  • [1] An enhanced process model for the semi-automated deployment of Simulation-aided Building
    Leal, Sergio
    Hauer, Stefan
    Judex, Florian
    Zucker, Gerhard
    [J]. IECON 2014 - 40TH ANNUAL CONFERENCE OF THE IEEE INDUSTRIAL ELECTRONICS SOCIETY, 2014, : 5331 - 5337
  • [2] Semi-automated simulation transformation for DDDAS
    Brogan, D
    Reynolds, P
    Bartholet, R
    Carnahan, J
    Loitière, Y
    [J]. COMPUTATIONAL SCIENCE - ICCS 2005, PT 2, 2005, 3515 : 721 - 728
  • [3] BIM interface for full vs. semi-automated building energy simulation
    Ahn, Ki-Uhn
    Kim, Young-Jin
    Park, Cheol-Soo
    Kim, Inhan
    Lee, Keonho
    [J]. ENERGY AND BUILDINGS, 2014, 68 : 671 - 678
  • [4] A Semi-Automated Building Outline Tool (SABOT)
    Simmons, Scott
    Thompson, Mike
    Lamb, Deborah
    McKay, Troy
    Hirsch, Herb
    [J]. GEOSPATIAL INFOFUSION III, 2013, 8747
  • [5] RCrane: semi-automated RNA model building
    Keating, Kevin S.
    Pyle, Anna Marie
    [J]. ACTA CRYSTALLOGRAPHICA SECTION D-BIOLOGICAL CRYSTALLOGRAPHY, 2012, 68 : 985 - 995
  • [6] Semi-automated building footprint extraction from orthophotos
    Brooks, Rheannon
    Nelson, Trisalyn
    Amolins, Krista
    Hall, G. Brent
    [J]. Geomatica, 2015, 69 (02) : 231 - 244
  • [7] A software program for semi-automated measurement of building facades
    Ordonez, Celestino
    Martinez, Joaquin
    Arias, Pedro
    Armesto, Julia
    [J]. MEASUREMENT, 2010, 43 (09) : 1197 - 1206
  • [8] Towards occupant-centric simulation-aided building design: a case study
    Abuimara, Tareq
    O'Brien, William
    Gunay, Burak
    Carrizo, Juan Sebastian
    [J]. BUILDING RESEARCH AND INFORMATION, 2019, 47 (08): : 866 - 882
  • [9] Simulation-aided thermal design of intermittent
    Xiao, Ying
    Dou, Xinyu
    Cai, Jian
    Feng, Tao
    [J]. 2007 INTERNATIONAL WORKSHOP ON ELECTRON DEVICES AND SEMICONDUCTOR TECHNOLOGY, 2007, : 89 - +
  • [10] Simulation-aided path planning of UAV
    Kamrani, Farzad
    Ayani, Rassul
    [J]. PROCEEDINGS OF THE 2007 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2007, : 1285 - 1293