共 50 条
- [1] Research on Carrying Capacity of Ticket Entrance, Stairs and Escalator of Large-Scale Railway Passenger Station [J]. 1600, Chinese Academy of Railway Sciences (38):
- [2] Research on Passenger Flow Conversion Capacity of Integrated Transit Hub Based on Zipper Theory [J]. CICTP 2022: INTELLIGENT, GREEN, AND CONNECTED TRANSPORTATION, 2022, : 2793 - 2802
- [3] Research on Integrated Passenger Transport Hub Service Facilities Capacity Based on AnyLogic Simulation [J]. CICTP 2020: ADVANCED TRANSPORTATION TECHNOLOGIES AND DEVELOPMENT-ENHANCING CONNECTIONS, 2020, : 3063 - 3074
- [4] Probability Model of Upstream Passenger Who Select Escalator in High-speed Rail Hub [J]. MANUFACTURING PROCESS AND EQUIPMENT, PTS 1-4, 2013, 694-697 : 3366 - 3369
- [6] Research on the Transfer Time Reliability of Urban Passenger Hub [J]. 2009 INTERNATIONAL CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION, VOL III, 2009, : 571 - +
- [8] Research on Evaluating functions and structures of Comprehensive Passenger Transport Hub [J]. PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 184 - 188
- [9] Research on Evaluating LOS of Facilities in Comprehensive Passenger Transport Hub [J]. EIGHTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, VOLS I-III, 2009, : 2463 - 2468
- [10] Research on Simulation of Pedestrian in Passenger Transfer Hub Based on Commuter [J]. SUSTAINABLE DEVELOPMENT AND ENVIRONMENT II, PTS 1 AND 2, 2013, 409-410 : 1407 - +