Approximate Experimental Simulation of Clogging of Pervious Concrete Pile Induced by Soil Liquefaction during Earthquake

被引:1
|
作者
Cui, Xin-Zhuang [1 ]
Jin, Qing [1 ]
Cui, She-Qiang [2 ]
Zhang, Jiong [1 ]
Zhang, Xiao-Ning [1 ]
机构
[1] Shandong Univ, Sch Civil Engn, Jinan 250061, Peoples R China
[2] Hong Kong Polytech Univ, Sch Civil Engn, Dept Civil & Environm Engn, Hung Hom,Kowloon, Hong Kong, Peoples R China
关键词
pervious concrete pile; clogging; permeability; earthquake; PERMEABILITY; BEHAVIOR; CONSOLIDATION; MECHANISMS;
D O I
10.1520/JTE20200048
中图分类号
TB3 [工程材料学];
学科分类号
0805 ; 080502 ;
摘要
It has been reported by previous studies that the pervious concrete pile (PCP) has the advantages of high permeability and strength as a novel ground-improvement technology. However, during an earthquake, the liquefied soil particle is bound to migrate into the PCP under the excess pore water pressure because of dynamic stress. This leads to the clogging of PCP. In this study, a permeability test system for an approximate simulation of this clogging is presented. The experimental results obtained by employing this system were reported and validated. In order to gain insight into the clogging caused by earthquake, the effects of the porosity on pervious concrete were evaluated. Clogging that accounted for the acceleration peak, the frequency, and the duration of vibration were characterized. The thickness of the impervious layer of ground surface and the pile spacing on the clogging were studied as well. Results show that within the scope of this study, the clogging of PCP is significantly related to the aforementioned factors. In addition to the thickness of the impervious soil layer, the clogging becomes more obviously with the increase of the other five factors. However, the overlarge values of some factors, such as the porosity of pervious concrete, the acceleration peak, and the frequency/duration of vibration, cannot obviously aggravate the clogging of pervious concrete. Based on the experimental evidence, a preliminary dynamic clogging model is proposed, which is helpful for the design of PCP composite foundation.
引用
收藏
页码:82 / 95
页数:14
相关论文
共 50 条
  • [1] Clogging of pervious concrete pile caused by soil piping: an approximate experimental study
    Cui, Xinzhuang
    Zhang, Jiong
    Chen, Darhao
    Li, Shucai
    Jin, Qing
    Zheng, Yingjie
    Cui, Sheqiang
    CANADIAN GEOTECHNICAL JOURNAL, 2018, 55 (07) : 999 - 1015
  • [2] Discussion of "Clogging of pervious concrete pile caused by soil piping: an approximate experimental study"
    Dallo, Yousif A. H.
    Xu, Guizhong
    CANADIAN GEOTECHNICAL JOURNAL, 2019, 56 (07) : 1056 - 1057
  • [3] Experimental Behavior of a Reinforced Concrete Pile During Liquefaction-Induced Lateral Spreading
    Ebeido, Ahmed
    Elgamal, Ahmed
    GEOTECHNICAL ENGINEERING IN THE XXI CENTURY: LESSONS LEARNED AND FUTURE CHALLENGES, 2019, : 453 - 460
  • [4] Centrifuge and numerical modeling of soil-pile interaction during earthquake induced soil liquefaction and lateral spreading
    Abdoun, T
    Dobry, R
    O'Rourke, TD
    OBSERVATION AMD MODELLING IN NUMERICAL ANALYSIS & MODEL TESTS IN DYNAMIC SOIL-STRUCTURE INTERACTION PROBLEMS, 1997, (64): : 76 - 90
  • [5] Failure Behavior of Concrete Pile and Super-Structure Dynamic Response as a Result of Soil Liquefaction during Earthquake
    Kaneda, Shogo
    Hayashi, Kazuhiro
    Hachimori, Wataru
    Tamura, Shuji
    Saito, Taiki
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE OF GLOBAL NETWORK FOR INNOVATIVE TECHNOLOGY AND AWAM INTERNATIONAL CONFERENCE IN CIVIL ENGINEERING (IGNITE-AICCE'17): SUSTAINABLE TECHNOLOGY AND PRACTICE FOR INFRASTRUCTURE AND COMMUNITY RESILIENCE, 2017, 1892
  • [6] Experimental simulation of rapid clogging process of pervious concrete pavement caused by storm water runoff
    Cui, Xinzhuang
    Zhang, Jiong
    Huang, Dan
    Tang, Weize
    Wang, Lei
    Hou, Fei
    INTERNATIONAL JOURNAL OF PAVEMENT ENGINEERING, 2019, 20 (01) : 24 - 32
  • [7] Reinforced Concrete Pile Response during Liquefaction-Induced Lateral Spreading: Experimental Insights
    Ebeido, Ahmed
    Prabhakaran, Athul
    Elgamal, Ahmed
    GEO-CONGRESS 2024: GEOTECHNICS OF NATURAL HAZARDS, 2024, 349 : 321 - 329
  • [8] Numerical Simulation of Pile-Soil Interaction Considering Sand Liquefaction under Earthquake
    Li, Peizhen
    Ma, Dongya
    Zeng, Daming
    Lu, Xilin
    VIBRATION, STRUCTURAL ENGINEERING AND MEASUREMENT II, PTS 1-3, 2012, 226-228 : 1019 - 1022
  • [9] Assessing the phenomenon of clogging of pervious concrete (Pc): Experimental test and model proposition
    Sandoval, Gersson F. B.
    Galobardes, Isaac
    Campos, Andre
    Toralles, Berenice M.
    JOURNAL OF BUILDING ENGINEERING, 2020, 29
  • [10] Experimental investigation of clogging mechanism of pervious concrete made with variable aggregate gradations
    Nazeer, M.
    Kapoor, K.
    Singh, S. P.
    MATERIALES DE CONSTRUCCION, 2023, 73 (351)