On-line control strategies to minimize peak loads on mine conveyor networks using surge units with variable discharging capability

被引:3
|
作者
Yingling, JC [1 ]
Luo, ZH [1 ]
Sottile, J [1 ]
机构
[1] THOMSON FINANCIAL SERV,WHEELING,IL 60090
关键词
bulk materials handling; control systems; conveyor networks; dynamic programming;
D O I
10.1109/28.567083
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Control of peak loads on gathering belts in mine conveyor systems can result in substantial reductions in power consumption as well as savings in capital and maintenance costs for the conveyor equipment. This paper first extends an existing control approach involving dynamic adjustment of feeder discharge rates to the case where the differences in transit times between section feeders and the gathering belts where the hows converge are small, It is shown that multiple units should be considered simultaneously when determining control actions! and a dynamic programming approach is given for determining the optimal control policy in such a situation, Subsequently, the application of this approach is considered for longwall mines where how from the longwall is not controlled, but the discharge rates of continuous miner section feeders are adjusted in real time to prevent belt overloading while minimizing any production constraint on the continuous miner units, This application requires special treatment for the highly variable material how pattern produced by longwalls. The practical utility of these approaches is evaluated through detailed simulation studies. These studies are used to estimate the magnitude of savings in energy, capital, and maintenance costs.
引用
收藏
页码:90 / 99
页数:10
相关论文
共 1 条