The scheduling of the multi-objective elevator based on TSP

被引:0
|
作者
Wen, Qianghua [1 ]
Ge, Bin [1 ]
机构
[1] Dalian Univ, Informat Proc Lab, Dalian, Liaoning, Peoples R China
关键词
TSP; multi-objective; scheduling of elevator; Ant colony algorithms;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper researches the scheduling of the multi-objective elevator from a new perspective, building a new model after modifying tsp model. Tsp is transformed into the problem of the multi-objective elevator control. The paper analyses waiting time and elevator energy consumption, solving the control of the multi-objective elevator successfully. Taking Ant colony algorithms as example, scheduling scheme of the multi-objective elevator is completed through the resolution of tsp.
引用
收藏
页码:409 / 412
页数:4
相关论文
empty
未找到相关数据