Roller compacted concrete and stepped spillways

被引:0
|
作者
Ditchey, EJ [1 ]
Campbell, DB [1 ]
机构
[1] Schnabel Engn Associates Inc, W Chester, PA 19380 USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The use of roller compacted concrete (RCC) for new dam construction and for rehabilitation of existing darns has gained wide acceptance throughout the world. RCC is a zero slump concrete that is transported, spread and compacted using traditional earth moving equipment. The placement of horizontal to near-horizontal lifts typical of RCC construction lends itself to the forming of steps into the downstream edge of each lift. Recognition of the benefits of steps, coupled with ease of construction, has led to numerous downstream facing alternatives. A variety of alternative step treatments and approaches to forming have been developed to address a wide range of issues such as durability, aesthetics, constructability and cost. Facing alternatives include formed and unformed steps of exposed RCC, grout-enriched RCC, cast-in-place concrete, and precast concrete. Each of these alternative treatments brings with it its own unique benefits, limitations and design detailing. The development of RCC technology and the evolution of RCC materials science have indirectly led to a rebirth in the use of stepped spillways.
引用
收藏
页码:171 / 178
页数:8
相关论文
共 50 条
  • [1] Impact of converging chute walls for roller compacted concrete stepped spillways
    Hunt, Sherry L.
    Kadavy, Kem C.
    Abt, Steven R.
    Temple, Darrel M.
    JOURNAL OF HYDRAULIC ENGINEERING, 2008, 134 (07) : 1000 - 1003
  • [2] Skimming, Nonaerated Flow on Stepped Spillways over Roller Compacted Concrete Dams
    Meireles, Ines
    Renna, Floriana
    Matos, Jorge
    Bombardelli, Fabian
    JOURNAL OF HYDRAULIC ENGINEERING, 2012, 138 (10) : 870 - 877
  • [3] Model study of a roller compacted concrete stepped spillway
    Rice, CE
    Kadavy, KC
    JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 1996, 122 (06): : 292 - 297
  • [4] Energy losses on a roller compacted concrete stepped spillway
    Robinson, KM
    Rice, CE
    Kadavy, KC
    Talbot, JR
    WATER RESOURCES ENGINEERING 98, VOLS 1 AND 2, 1998, : 1434 - 1439
  • [5] Model study of a roller compacted concrete stepped spillway - Discussion
    Matos, J
    JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 1997, 123 (10): : 933 - 936
  • [6] Model study of a roller compacted concrete stepped spillway: Discussion
    Dept. of Civ. Engrg., Univ. of Queensland, Brisbane QLD 4072, Australia
    J. Hydraul. Eng., 10 (931-933):
  • [7] Roller compacted concrete and roller compacted dam
    Yuzawa, Shozo
    Indian Concrete Journal, 2007, 81 (11): : 29 - 33
  • [8] ROLLER COMPACTED CONCRETE
    不详
    JOURNAL OF THE AMERICAN CONCRETE INSTITUTE, 1980, 77 (04): : 215 - 236
  • [9] Discussion of "Skimming, Nonaerated Flow on Stepped Spillways over Roller Compacted Concrete Dams" by Ines Meireles, Floriana Renna, Jorge Matos, and Fabian Bombardelli
    Pfister, Michael
    Boes, Robert M.
    JOURNAL OF HYDRAULIC ENGINEERING, 2014, 140 (10)
  • [10] Characterization of the pressure field over a stepped spillway in Roller Compacted Concrete dams
    Sánchez-Juny, M
    Dolz, J
    ROLLER COMPACTED CONCRETE DAMS, 2003, : 697 - 700