An investigation on the behavior of a new connection for precast structures under reverse cyclic loading

被引:67
|
作者
Lu, Cong [1 ]
Dong, Bingqing [1 ]
Pan, Jinlong [1 ]
Shan, Qifeng [1 ]
Hanif, Asad [2 ]
Yin, Wanyun [3 ]
机构
[1] Southeast Univ, Key Lab Concrete & Prestressed Concrete Struct, Minist Educ, Nanjing, Jiangsu, Peoples R China
[2] Mirpur Univ Sci & Technol, Civil Engn Dept, Mirpur, Azad Kashmir, Pakistan
[3] China MCC17 Grp Co Ltd, Maanshan, Peoples R China
基金
中国国家自然科学基金;
关键词
Precast connection; U-shaped bars; Engineered Cementitious Composite (ECC); Cyclic loading; ENGINEERED CEMENTITIOUS COMPOSITES; MOMENT-RESISTING FRAMES; MATRIX DUCTILITY; CONCRETE FRAMES; COLUMN JOINTS; CONSTRUCTION; EARTHQUAKE; BUILDINGS; TESTS; ECC;
D O I
10.1016/j.engstruct.2018.05.041
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper aims to develop a new precast beam-column connection with U-shaped bars and ECC materials, which eliminates the need for formworks, welding and bolting. In this paper, an experimental study of five precast and two monolithic connections, including exterior and interior connections under reverse cyclic loading, will be carried out. All specimens were evaluated by their failure mode, hysteresis characteristics, stiffness degradation, ductility and energy dissipation under reverse cyclic loading. The proposed connection using high strength concrete exhibited more satisfactory seismic behavior than the cast-in-place construction in terms of hysteretic behavior, stiffness degradation and energy dissipation, while their load-carrying capacity and ductility were slightly lower. When ECC material is incorporated, these precast connections showed improved load-carrying capacity and ultimate displacement compared with the precast connections using concrete. Their seismic performance is comparable to (even better at certain aspects) the conventional cast-in-place connections and is therefore recommended for the applications in the high seismic region.
引用
收藏
页码:131 / 140
页数:10
相关论文
共 50 条
  • [1] Behaviour of Precast Column Foundation Connection under Reverse Cyclic Loading
    Hemamathi, L.
    Jaya, K. P.
    ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [2] Experimental investigation of a new precast column-foundation connection under cyclic loading
    Cogurcu, Mustafa Tolga
    Uzun, Mehmet
    JOURNAL OF BUILDING ENGINEERING, 2022, 50
  • [3] Investigation on seismic behavior of a new beam-column joint for precast concrete structures under reversed cyclic loading
    Li, Hu
    Du, Yongfeng
    Han, Jianping
    Li, Fangyu
    STRUCTURES, 2024, 70
  • [4] Development and testing of damage controllable precast beam–column connection under reverse cyclic loading
    Krishnan T.
    Purushothaman R.
    Asian Journal of Civil Engineering, 2020, 21 (8) : 1343 - 1354
  • [5] Development of a new connection for precast concrete walls subjected to cyclic loading
    Ramin Vaghei
    Farzad Hejazi
    Hafez Taheri
    Mohd Saleh Jaafar
    Farah Nora Aznieta Abdul Aziz
    Earthquake Engineering and Engineering Vibration, 2017, 16 : 97 - 117
  • [6] Development of a new connection for precast concrete walls subjected to cyclic loading
    Ramin Vaghei
    Farzad Hejazi
    Hafez Taheri
    Mohd Saleh Jaafar
    Farah Nora Aznieta Abdul Aziz
    Earthquake Engineering and Engineering Vibration, 2017, 16 (01) : 97 - 117
  • [7] Development of a new connection for precast concrete walls subjected to cyclic loading
    Vaghei, Ramin
    Hejazi, Farzad
    Taheri, Hafez
    Jaafar, Mohd Saleh
    Aziz, Farah Nora Aznieta Abdul
    EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION, 2017, 16 (01) : 97 - 117
  • [8] Mechanical behavior of corrugated grouted sleeve splice for precast concrete structures under cyclic loading
    Wei, Muwang
    Peng, Yukang
    Li, Huawei
    Xiao, Boren
    ADVANCES IN CONCRETE CONSTRUCTION, 2025, 19 (01) : 31 - 42
  • [9] Experimental study of a new beam-to-column connection for precast concrete frames under reversal cyclic loading
    Guan, Dongzhi
    Guo, Zhengxing
    Xiao, Quandong
    Zheng, Yongfeng
    ADVANCES IN STRUCTURAL ENGINEERING, 2016, 19 (03) : 529 - 545
  • [10] Mechanical performance of precast pile cap-to-pile connection under cyclic loading
    Li, Guoping
    Qin, Zhongyu
    Cao, Sugong
    Tang, Xiaolin
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2021, 54 (01): : 106 - 115