Case Study of Innovative Top-Down Construction Method with Channel-Type Excavation

被引:34
|
作者
Li, Ming-Guang [1 ]
Chen, Jin-Jian [1 ]
Xu, An-Jun [2 ]
Xia, Xiao-He [1 ]
Wang, Jian-Hua [1 ]
机构
[1] Shanghai Jiao Tong Univ, Dept Civil Engn, Shanghai 200240, Peoples R China
[2] Shanghai Fdn Engn Co Ltd, Shanghai 200002, Peoples R China
基金
中国国家自然科学基金;
关键词
Excavation; Construction management; Case studies; Top-down method; Channel type; Construction efficiency; Deformation; Construction materials and methods; WALL;
D O I
10.1061/(ASCE)CO.1943-7862.0000828
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Although the conventional top-down construction method is widely used in deep excavation, it has the drawback of low efficiency attributable to the long hauling distance and the possibility of the occurrence of excessive excavation deformation and construction risk. This paper introduces a case of deep metro station excavation at West Shanghai Railway Station. The top-down construction method must be used because the excavation is located under a running high-speed railway, and an innovative excavation scheme is proposed to improve construction efficiency and to control excavation deformation. In this method, an operation channel for earth hauling is first excavated in the middle of the excavation. With the available operation channel, the soil on both sides of the channel is excavated simultaneously in a segment pattern, and the required strut systems are subsequently constructed. Both the excavated soil and the construction materials are transported through the channel. This channel-type construction method that resolves the conflict between soil excavation and substructure construction allows for continuous excavation and, thus, reduces construction time and decreases excavation deformation. The case study demonstrates that the presented channel-type excavation is very effective in shortening construction time and reducing both construction cost and excavation deformation.
引用
收藏
页数:10
相关论文
共 50 条
  • [1] Channel-type technique of earthwork for top-down excavation and its application
    Xu, An-Jun
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2012, 46 (10): : 1558 - 1562
  • [2] Geodetic Accuracy in Observational Construction of an Excavation Stabilized by Top-Down Method: A Case Study
    Ghorbani, E.
    Khodaparast, M.
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2019, 37 (06) : 4759 - 4775
  • [3] Geodetic Accuracy in Observational Construction of an Excavation Stabilized by Top-Down Method: A Case Study
    E. Ghorbani
    M. Khodaparast
    Geotechnical and Geological Engineering, 2019, 37 : 4759 - 4775
  • [4] Innovative Top-Down Construction Method with a Sequential Peripheral Wall
    Rojhani, Mahdi
    Bayesteh, Hamed
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2023, 41 (03) : 1777 - 1799
  • [5] Innovative Top-Down Construction Method with a Sequential Peripheral Wall
    Mahdi Rojhani
    Hamed Bayesteh
    Geotechnical and Geological Engineering, 2023, 41 : 1777 - 1799
  • [6] Structural behavior in top-down excavation method
    Fateh, Amir
    Hejazi, Farzad
    Ming, Yong Pei
    Jafaar, Mohd Saleh
    ARABIAN JOURNAL OF GEOSCIENCES, 2015, 8 (09) : 7399 - 7408
  • [7] Structural behavior in top-down excavation method
    Amir Fateh
    Farzad Hejazi
    Yong Pei Ming
    Mohd Saleh Jafaar
    Arabian Journal of Geosciences, 2015, 8 : 7399 - 7408
  • [8] Key construction techniques for oversized excavation pits using top-down method
    Liu, Y. (shangdaly@qq.com), 2013, Chinese Society of Civil Engineering (35):
  • [9] Innovative Design of Key Nodes in Construction of Top-Down Construction
    Fang Tao
    Qin Shuwen
    Fang Guangxiu
    PROCEEDINGS OF 8TH INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION (ICICTA 2015), 2015, : 490 - 493
  • [10] Performance of a top-down excavation in shanghai: case study and numerical exploration
    Yang, Zhenkun
    Chen, Youliang
    Azzam, Rafig
    Yan, Chao
    EUROPEAN JOURNAL OF ENVIRONMENTAL AND CIVIL ENGINEERING, 2022, 26 (15) : 7932 - 7957