Infrastructure Project Scope Definition Using Project Definition Rating Index

被引:36
|
作者
Bingham, Evan [1 ]
Gibson, G. Edward, Jr. [2 ,3 ]
机构
[1] Brigham Young Univ, Ira A Fulton Coll Engn & Technol, Construct & Facil Management, Provo, UT 84602 USA
[2] Arizona State Univ, Sch Sustainable Engn & Built Environm, POB 873005, Tempe, AZ 85287 USA
[3] Arizona State Univ, Construct Management & Engn, POB 873005, Tempe, AZ 85287 USA
关键词
Front-end planning (FEP); Project definition rating index (PDRI); Planning; Scope definition; Risk management;
D O I
10.1061/(ASCE)ME.1943-5479.0000483
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Front-end planning (FEP) is a critical process for uncovering project unknowns while also developing adequate scope definition and a structured approach for the project execution process. For infrastructure projects, the FEP process assists in identifying and mitigating risks stemming from issues such as right-of-way concerns, utility adjustments, environmental hazards, logistic problems, and permitting requirements. The authors have developed a novel risk management tool, called the project definition rating index (PDRI) for infrastructure projects, which can be used to identify and address these issues systematically and in a structured manner. Input from 64 industry professionals representing over 30 organizations was used in the development of the tool. In addition to a usable definition for infrastructure in the context of the built environment, a finite and specific list of issues related to scope definition of infrastructure projects was developed with this industry input. Data from 26 completed or in-process projects are given. Results show that the PDRI assessment score is indicative of the current level of scope definition for sample projects and corresponds to project performance. Findings support the hypothesis that projects with improved early understanding of scope definition elements showed improved project outcomes; infrastructure projects with low PDRI scores (well defined) outperformed projects with high PDRI scores. This research contributes to the body of knowledge by specifically identifying those FEP elements that are critical to infrastructure projects.
引用
收藏
页数:8
相关论文
共 50 条
  • [1] Building project scope definition using project definition rating index
    Cho, C.-S.
    Gibson, G.E.
    [J]. 2001, American Society of Civil Engineers (07)
  • [2] Intelligent Green Buildings Project Scope Definition Using Project Definition Rating Index (PDRI)
    Chu Tih-Ju
    Chang An-Pi
    Hwang Chao-Lung
    Lin Jyh-Dong
    [J]. 4TH INTERNATIONAL CONFERENCE ON BUILDING RESILIENCE, INCORPORATING THE 3RD ANNUAL CONFERENCE OF THE ANDROID DISASTER RESILIENCE NETWORK, 2014, 18 : 17 - 24
  • [3] Road Construction Project Environmental Impact Assessment Scope Definition Using Project Definition Rating Index (PDRI)
    Chang, An-Pi
    Chou, Chien-Cheng
    Lin, Jyh-Dong
    Hsu, Chen-Yu
    [J]. INNOVATION AND SUSTAINABLE TECHNOLOGY IN ROAD AND AIRFIELD PAVEMENT, 2013, 723 : 885 - 892
  • [4] Management using project definition rating index
    Dumont, PR
    Gibson, GE
    Fish, JR
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 1997, 13 (05) : 54 - 60
  • [5] A Forensic Evaluation of Projects in Afghanistan Using the Project Definition Rating Index (PDRI)
    Mohammady, Sefatullah
    Gibson, G. Edward, Jr.
    [J]. CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 181 - 190
  • [6] Assessing the impact of project brief clarity using project definition rating index tool and system dynamic
    Vahabi, Ali
    Nasirzadeh, Farnad
    Mills, Anthony
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (02) : 697 - 713
  • [7] Design quality in pre-project planning: applications of the Project Definition Rating Index
    Gibson, GE
    Gebken, RJ
    [J]. BUILDING RESEARCH AND INFORMATION, 2003, 31 (05): : 346 - 356
  • [8] Development of a project definition rating index (PDRI) for general building projects
    Cho, CS
    Gibson, GE
    [J]. CONSTRUCTION CONGRESS VI, PROCEEDING: BUILDING TOGETHER FOR A BETTER TOMORROW IN AN INCREASINGLY COMPLEX WORLD, 2000, : 343 - 352
  • [9] Front-End Planning for Large and Small Infrastructure Projects: Comparison of Project Definition Rating Index Tools
    Elzomor, Mohamed
    Burke, Rebekah
    Parrish, Kristen
    Gibson, G. Edward, Jr.
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2018, 34 (04)
  • [10] Priority of Requirements and Method for Definition of Project Scope
    Myslin, Josef
    Kaiser, Jiri
    [J]. SUSTAINABLE ECONOMIC GROWTH, EDUCATION EXCELLENCE, AND INNOVATION MANAGEMENT THROUGH VISION 2020, VOLS I-VII, 2017, : 4002 - 4013