DDP: A tool for life-cycle risk management

被引:3
|
作者
Cornford, Steven L. [1 ]
Feather, Martin S. [1 ]
Hicks, Kenneth A. [1 ]
机构
[1] CALTECH, Jet Prop Lab, Strateg Syst Technol Program Off, Pasadena, CA 91109 USA
关键词
D O I
10.1109/MAES.2006.1662004
中图分类号
V [航空、航天];
学科分类号
08 ; 0825 ;
摘要
At JPL we have developed and implemented a process for achieving fife-cycle risk management. This process has been embodied in a software tool and is called Defect Detection and Prevention (DDP). The DDP process can be succinctly stated as: determine where we want to be, what could get in the way and how we will get there. The "determine where we want to be" is captured as trees of requirements and the "what could get in the way" is captured as trees of potential failure modes'. Scoring the impacts of these failure modes on the requirements results in a prioritized set of failure modes. The user then selects from a set of Preventative measures, Analyses, process Controls and Tests (PACTS) each of which has an effectiveness versus the various failure modes. It is the goal of the DDP process to optimally select the subset of the PACTs(2) which minimizes the residual risk subject to the project resource constraints. The DDP process is intended to facilitate risk management over the entire project fife cycle beginning with architectural and advanced technology decisions all the way through operation. As the project design, technology content, and implementation approach matures, the requirements and failure mode trees are elaborated upon to accommodate the additional information. Thus, the DDP process is a systematic, continuous, top-down approach to managing risk. Implementation of the DDP process requires a critical mass of expertise (usually the project team and a few specialists) and captures both their engineering judgement as wen as available quantitative data. This additional data may result from models, layouts, prototype testing, other focused risk evaluations and institutional experiences. The DDP process also identifies areas where additional information would be advantageous, thus allowing a project to target critical areas of risk or risk uncertainty. This also allows the project to identify those areas which would benefit the most from application of other quantitative tools and methods (e.g. Monte Carlo simulations, FMECAs, fault trees). The software tool supports the DDP process by providing guidance for implementing the process steps, graphical visualizations of the various trees, their interrelationships and the current risk landscape. The tool is capable of supporting on-the-fly knowledge elicitation as well as integrating off-line deliberations. There are a variety of available outputs including graphs, trees and reports as well as clear identification of the driving requirements, "tall-pole"' residual risks and the PACTS which have been selected and agreed upon. The DDP process has been applied at various levels of assembly including the system and subsystem levels, as well as down to the component level. Recently, significant benefits have been realized from application to advanced technologies, where the focus has been on increasing the infusion rates of these technologies by identification and mitigation of risks prior to delivery to a project.
引用
收藏
页码:13 / 22
页数:10
相关论文
共 50 条
  • [1] DDP - A tool for life-cycle risk management
    Cornford, SL
    Feather, MS
    Hicks, KA
    [J]. 2001 IEEE AEROSPACE CONFERENCE PROCEEDINGS, VOLS 1-7, 2001, : 441 - 451
  • [2] Nanotechnology - Life-cycle risk management
    Sweet, Leonard
    Strohm, Bradford
    [J]. HUMAN AND ECOLOGICAL RISK ASSESSMENT, 2006, 12 (03): : 528 - 551
  • [3] The status of life-cycle assessment as an environmental management tool
    Curran, MA
    [J]. ENVIRONMENTAL PROGRESS, 2004, 23 (04): : 277 - 283
  • [4] MACHINE TOOL LIFE-CYCLE
    Dosedla, Michal
    [J]. ANNALS OF DAAAM FOR 2009 & PROCEEDINGS OF THE 20TH INTERNATIONAL DAAAM SYMPOSIUM, 2009, 20 : 75 - 76
  • [5] Research of Cutting Tool Life-cycle Information Management Platform
    Sheng Jing
    Fang Yadong
    [J]. ISBIM: 2008 INTERNATIONAL SEMINAR ON BUSINESS AND INFORMATION MANAGEMENT, VOL 2, 2009, : 421 - +
  • [6] Development of a software-tool for the life-cycle management of bridges
    Kluth, M.
    Borrmann, A.
    Rank, E.
    Mayer, T.
    Schiessl, P.
    [J]. LIFE-CYCLE CIVIL ENGINEERING, 2008, : 571 - +
  • [7] Installation life-cycle management
    Smith, DK
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 1997, 11 (02) : 83 - 83
  • [8] Research and Development of Cutting Tool Life-Cycle Information Management System
    Sheng, Jing
    Fang, Yadong
    [J]. 2013 INTERNATIONAL CONFERENCE ON MANAGEMENT AND INFORMATION TECHNOLOGY, 2013, : 532 - 537
  • [9] Life-cycle assessment as an environmental management tool in the production of potable water
    Friedrich, E
    [J]. WATER SCIENCE AND TECHNOLOGY, 2002, 46 (09) : 29 - 36
  • [10] LIFE-CYCLE MANAGEMENT OF PHARMACEUTICALS
    BRUPPACHER, R
    [J]. JOURNAL OF OCCUPATIONAL ACCIDENTS, 1990, 13 (1-2): : 135 - 137