Application of System Dynamics in Environmental Risk Management of Project Management for External Stakeholders

被引:13
|
作者
Yang, Chao-Chung [1 ]
Yeh, Chao-Hsien [1 ]
机构
[1] Feng Chia Univ, Dept Water Resources Engn & Conservat, Taichung 40724, Taiwan
关键词
System dynamics; Environmental risk management; External stakeholders; System archetypes; Project management;
D O I
10.1007/s11213-013-9283-y
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Environmental risks arise from external forces that can easily render a project out of management control. Project managers who want to avoid external-force effects must understand the problems between the project and possible external stakeholders. Most traditional risk-management techniques are used to create a list of identified risks based on the experiences and opinions of experts or kernel members such that the relationship between risks or the feedback characteristics are impossible to discover. System dynamics (SD) can use dynamics and feedback to assist decision makers in understanding the structure and characteristics of a complex system. Therefore, this study applies SD to propose a 7-step process for solving an environmental risk management problem systematically, and efficiently. This process enables project managers to reduce the negative effects of project threats. Finally, this study conducts a simplified case study of an industrial area development project to present the viability of the proposed methodology.
引用
收藏
页码:211 / 225
页数:15
相关论文
共 50 条
  • [1] Application of System Dynamics in Environmental Risk Management of Project Management for External Stakeholders
    Chao-Chung Yang
    Chao-Hsien Yeh
    Systemic Practice and Action Research, 2014, 27 : 211 - 225
  • [2] MANAGEMENT OF STAKEHOLDERS IN PROJECT MANAGEMENT
    Noro, Greice de Bem
    REVISTA DE GESTAO E PROJETOS, 2012, 3 (01): : 127 - 158
  • [3] SYSTEM DYNAMICS METHODOLOGY: APPLICATION IN PROJECT MANAGEMENT EDUCATION
    Svirakova, Eva
    EFFICIENCY AND RESPONSIBILITY IN EDUCATION 2014, 2014, : 813 - 822
  • [4] External Wall Insulation System Engineering Based on Project Risk Management
    Shang, Mei
    Hao, Wentao
    CONFERENCE PROCEEDINGS OF THE 6TH INTERNATIONAL SYMPOSIUM ON PROJECT MANAGEMENT (ISPM2018), 2018, : 118 - 125
  • [5] Application of System Dynamics to Project Management in Old Urban Redevelopment
    Wang Yang
    Wang Xiao-ming
    Yang Fan
    2007 INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-15, 2007, : 5236 - 5239
  • [6] Project Management for Different Stakeholders
    Gelrud, Ya. D.
    Loginovskiy, O. V.
    2016 2ND INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING, APPLICATIONS AND MANUFACTURING (ICIEAM), 2016,
  • [7] Application of Risk Management in the Energy Engineering Project Management
    Guo Yuanli
    STATISTIC APPLICATION IN MODERN SOCIETY, 2015, : 307 - 312
  • [8] Application of Project Management Process on Environmental Management System Improvement in Mining-Energy Complexes
    Nikolic, Jelena Malenovic
    Vasovic, Dejan
    Filipovic, Ivana
    Musicki, Stevan
    Ristovic, Ivica
    ENERGIES, 2016, 9 (12):
  • [9] Bridging External Stakeholders and Sustainability Literature: a review looking at a project management context
    dos Santos, Manoela Pastor
    Raposo, Marcela Melo Rego
    Ferreira, Edivan Alexandre
    Berssaneti, Fernando Tobal
    Salerno, Mario Sergio
    de Carvalho, Marly Monteiro
    BRAZILIAN JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2023, 20 (03):
  • [10] SYSTEM DYNAMICS FOR PROJECT-MANAGEMENT
    RIFKIN, S
    IEEE SOFTWARE, 1991, 8 (06) : 90 - 91