Computer-aided packing shop scheduling in a manufacturing plant

被引:6
|
作者
Lagodimos, AG
Charalambopoulos, A
Kavgalaki, A
机构
[1] Vector Consultants, GR-171 23 Nea Smirni
[2] Elais S.A., GR-185 10 Piraeus
关键词
MRP; hierarchical planning; production scheduling; heuristics;
D O I
10.1016/0925-5273(95)00076-3
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Consideration is given to the problem of generating weekly production schedules for the packing shop of a processed food manufacturing company. In order to be feasible, a packing shop schedule needs to satisfy a multiplicity of technological and other constraints. In this paper we describe this particular scheduling problem and present a procedure developed for the computer-aided scheduling of the packing shop of the company. An interactive computer program, developed in the PROGRESS RDBMS environment, is also presented. The computer-aided scheduling procedure has now been actually implemented, showing considerable improvements over the previous scheduling practice of the company. The paper is concluded with a discussion and proposals for future research.
引用
收藏
页码:621 / 630
页数:10
相关论文
共 50 条