Color-coating production scheduling in the steel industry

被引:0
|
作者
Wang, Xianpeng [1 ]
Tang, Lixin [1 ]
机构
[1] Northeastern Univ, Logist Inst, Shenyang 110004, Peoples R China
关键词
CCPS; steel industry; tabu search;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper proposes a new integer programming model and a tabu search heuristics for large-scale scheduling in the iron and steel industry, called Color-Coating Production Scheduling (CCPS). The results obtained from real production instances show that the model and heuristics are more effective and efficient with comparison to the manual scheduling.
引用
下载
收藏
页码:81 / 84
页数:4
相关论文
共 50 条
  • [1] Color-coating production scheduling for coils in inventory in steel industry
    Tang, Lixin
    Wang, Xianpeng
    Liu, Jiyin
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2008, 5 (03) : 544 - 549
  • [2] A predictive reactive scheduling method for color-coating production in steel industry
    Tang, Lixin
    Wang, Xianpeng
    International Journal of Advanced Manufacturing Technology, 2008, 35 (7-8): : 633 - 645
  • [3] A predictive reactive scheduling method for color-coating production in steel industry
    Tang, Lixin
    Wang, Xianpeng
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 35 (7-8): : 633 - 645
  • [4] A predictive reactive scheduling method for color-coating production in steel industry
    Lixin Tang
    Xianpeng Wang
    The International Journal of Advanced Manufacturing Technology, 2008, 35 : 633 - 645
  • [5] Simultaneously scheduling multiple turns for steel color-coating production
    Tang, Lixin
    Wang, Xianpeng
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 198 (03) : 715 - 725
  • [6] A Decision Support System for Color-Coating Line in Steel Industry
    Gao, Cong
    Tang, Lixin
    2008 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS, VOLS 1-6, 2008, : 1463 - 1468
  • [7] Modeling and Solution for the Coil Sequencing Problem in Steel Color-Coating Production
    Tang, Lixin
    Yang, Yang
    Liu, Jiyin
    IEEE TRANSACTIONS ON CONTROL SYSTEMS TECHNOLOGY, 2012, 20 (06) : 1409 - 1420
  • [8] Optimization Control of the Color-Coating Production Process for Model Uncertainty
    He, Dakuo
    Wang, Zhengsong
    Yang, Le
    Mao, Zhizhong
    COMPUTATIONAL INTELLIGENCE AND NEUROSCIENCE, 2016, 2016
  • [9] Color-Coating Scheduling With a Multiobjective Evolutionary Algorithm Based on Decomposition and Dynamic Local Search
    Dong, Zhiming
    Wang, Xianpeng
    Tang, Lixin
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2021, 18 (04) : 1590 - 1601
  • [10] NEW TUBE COLOR-COATING PROCESS PLANT
    不详
    MACHINERY AND PRODUCTION ENGINEERING, 1977, 130 (3356): : 349 - 349