MICROSIMULATION OF TOTAL COST OF OWNERSHIP IN QUARRIES

被引:0
|
作者
Uhlin, E. [1 ,2 ]
机构
[1] Volvo Construct Equipment, Eskilstuna, Sweden
[2] KTH Royal Inst Technol, Div Traff & Logist, Stockholm, Sweden
来源
TRANSPORTATION & LOGISTICS MANAGEMENT | 2012年
关键词
TCO; Quarries; CO2-emissions; Simulation; Optimization;
D O I
暂无
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
The production of aggregates in quarries consists of connected processes; drilling, blasting, transport and crushing/screening. This research relates to the quarry transports performed by wheel loaders and articulated haulers. To evaluate transport efficiency the total cost per transported tonne is used. This measure enables comparisons between different set ups and scenarios. A simulation system has been designed to calculate fleet performance. The system uses detailed dynamic machine models. Simulations have been carried out to evaluate CO2 emissions per transported tonne for different combinations of machines and fleet sizes. The system also provides the possibility to optimize transportation in terms of total cost of ownership (TCO).
引用
收藏
页码:375 / 382
页数:8
相关论文
共 50 条
  • [1] How total is a total cost of ownership?
    De Clerck Q.
    van Lier T.
    Lebeau P.
    Messagie M.
    Vanhaverbeke L.
    Macharis C.
    Van Mierlo J.
    De Clerck, Quentin (Quentin.De.Clerck@vub.ac.be), 1600, AVERE (08) : 736 - 747
  • [2] Re: Total Cost of Ownership
    Stein, Jeff
    ASHRAE JOURNAL, 2009, 51 (07) : 11 - 12
  • [3] Total cost of ownership equation
    Havlik, Chris
    Surface mount technology, 2000, 14 (03):
  • [4] Total Cost of Ownership (TCO)
    Schreiber, F.
    VDI Berichte, 1996, (1305):
  • [5] Reducing total cost of ownership
    Wierdf, Folkert
    Åhgren, Patrick
    SMT Surface Mount Technology Magazine, 2007, 21 (09):
  • [6] Re: Total Cost of Ownership
    Howell, Ronald H.
    Land, Donald W.
    ASHRAE JOURNAL, 2009, 51 (06) : 12 - 12
  • [7] Total cost of ownership equation
    Havlik, Chris
    SMT Surface Mount Technology Magazine, 2000, 14 (03):
  • [8] Re: Total Cost of Ownership Response
    Naguib, Ramez
    ASHRAE JOURNAL, 2009, 51 (06) : 13 - 13
  • [9] Total cost of ownership fills pump
    不详
    NAVAL ARCHITECT, 2007, : 17 - 17
  • [10] Re: Total Cost of Ownership Response
    Naguib, Ramez
    ASHRAE JOURNAL, 2009, 51 (07) : 12 - 12