A Study of Annulus Lubrication for Oil Well Completion Using Scale Model Tests

被引:0
|
作者
Adams, M. [1 ]
Turner, N. [1 ]
Pollard, P. [1 ]
机构
[1] Robert Gordon Univ, Sch Engn, Ctr Res Energy & Environm, Aberdeen AB10 1FR, Scotland
来源
关键词
D O I
暂无
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
When an oil reservoir reaches the end of its production life the well which has been drilled to extract the oil must undergo completion or "well abandonment". Abandonment is the process whereby all the productive zones within the well are isolated with cement, removing some or all of the production tubing and setting a surface plug in the well with the top of the plug between 30 and 50 in below the mudline. The process of abandonment can be hampered if it is not possible to remove pipes from within the well casing. It is proposed that by lubricating the annulus, the space between the casing and pipe, it may be possible to extract problematic pipe work by reaching pressure equilibrium between the reservoir and annulus. Experiments have been carried out to investigate the mixing time of a heavy brine with water. This mixing is known as lubrication. Lubrication can be used to increase the pressure (or fluid weight) at the bottom of a well. When heavy brine is added at the top of a column of water the fluids will mix and the resulting fluid has a greater density than that of water which increases the pressure at the bottom of the well. The experiments were carried out in test rigs comprising of a clear plastic tube scaled at the lower end and connected to a Perspex tank by a ball valve at the top of the tube. The dimensions of the test rigs were chosen to be a scale representation of a typical oil well. The well geometry was simplified with the upper part of the tube vertical and the lower part of the tube inclined at an angle to the vertical with the joint occurring at roughly 60% of the vertical distance from the top. The diameter of the tubing could not be scaled using the same length scale and so instead a number of tube diameters were tested. The ratio of fluid volumes above and below the circulation point was conserved with the brine volume being equal to 75% of the water volume; i.e. a 3:4 ratio. The pressure at the lower end of the tube was measured using a piezoelectric sensor inserted through the centre of the plug sealing the end of the tube. Tests were carried out for 10 mm, 20 mm, 40 mm, 60 mm and 100 mm diameter tubes. The aim of these tests was to demonstrate the relationship between tube diameter and time taken to reach equilibrium. For all of these tests the total vertical distance from the top of the tube to the pressure sensor was 3.0 m. Additional experiments were carried out to establish if the relationship between tube length and time taken to reach equilibrium is linear. Straight lengths of 1.0 m, 1.5 m, 2.0 m, 2.5 m and 3.0 m of 40 mm diameter tube were tested. Initially the mixing of the brine and the water is rapid but as the time from valve opening increases the rate of change of pressure with time reduces approaching the final value asymptotically. This makes it unlikely that the lubrication process will be carried out in order to reach the final pressure and so results are presented in terms of the time taken to reach 75% of the final pressure. Increasing the tube diameter was shown to reduce the time required to reach 75% of the final pressure. It was also established that there is not a linear relationship between tube length and time taken to reach equilibrium. This demonstrates that whilst lubrication can be used to increase the pressure at the bottom of an oil well the time scale needed to produce a significant increase in pressure is very large.
引用
收藏
页码:1051 / 1058
页数:8
相关论文
共 50 条
  • [1] Prediction model of casing annulus pressure for deepwater well drilling and completion operation
    Yang Jin
    Tang Haixiong
    Liu Zhengli
    Yang Liping
    Huang Xiaolong
    Yan De
    Tian Ruirui
    PETROLEUM EXPLORATION AND DEVELOPMENT, 2013, 40 (05) : 661 - 664
  • [2] Prediction model of casing annulus pressure for deepwater well drilling and completion operation
    Yang, Jin
    Tang, Haixiong
    Liu, Zhengli
    Yang, Liping
    Huang, Xiaolong
    Yan, De
    Tian, Ruirui
    Shiyou Kantan Yu Kaifa/Petroleum Exploration and Development, 2013, 40 (05): : 616 - 619
  • [3] WELL COMPLETION OPTIMIZATION FOR AN IRANIAN OIL FILED WITH SCALE PARODUCTION PROBLEM
    Rasouli, Hanieh
    Khamehchi, Ehsan
    Rashidi, Fariborz
    Ebrahimian, Amir
    10TH INTERNATIONAL MULTIDISCIPLINARY SCIENTIFIC GEOCONFERENCE: SGEM 2010, VOL I, 2010, : 753 - +
  • [4] Nonlinear model predictive control scheme for stabilizing annulus pressure during oil well drilling
    Nygaard, Gerhard
    Naevdal, Geir
    JOURNAL OF PROCESS CONTROL, 2006, 16 (07) : 719 - 732
  • [5] Searching for reservoirs with bypassed oil using well tests and mathematical modeling
    Kryganov, P., V
    Afanaskin, I., V
    Volpin, S. G.
    Akhapkin, M. Yu
    Yalov, P., V
    JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2021, 206 (206)
  • [6] A lubrication model for bubbly oil lubrication with interfacial effect and thermal effect using the theory of multiphase mixtures
    Li, Shaohua
    Lin, Xiaohui
    Jiang, Shuyun
    FRICTION, 2024, 12 (02) : 271 - 290
  • [7] A lubrication model for bubbly oil lubrication with interfacial effect and thermal effect using the theory of multiphase mixtures
    Shaohua Li
    Xiaohui Lin
    Shuyun Jiang
    Friction, 2024, 12 : 271 - 290
  • [8] Study on the wheel/rail adhesion characteristic under water and oil conditions by using mixed lubrication model
    Wang, Xiaopeng
    Hua, Hongpeng
    Peng, Kun
    Wu, Biqiong
    Tang, Zhengyang
    WEAR, 2024, 544
  • [9] Study on the wheel/rail adhesion characteristic under water and oil conditions by using mixed lubrication model
    Wang, Xiaopeng
    Hua, Hongpeng
    Peng, Kun
    Wu, Biqiong
    Tang, Zhengyang
    Wear, 2024, 544-545
  • [10] An analytical model for inter-well tracer tests in lenticular oil reservoirs
    Coronado, Manuel
    Ramirez-Sabag, Jetzabeth
    JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2011, 77 (02) : 189 - 193