Differentiated preemptive dispatching for automatic materials handling services in 300 mm semiconductor foundry

被引:29
|
作者
Liao, Da-Yin
Wang, Chia-Nan
机构
[1] Natl Chi Nan Univ, Dept Informat Management, Puli 545, Nantou Hsien, Taiwan
[2] Yuanpei Univ Sci & Technol, Inst Business & Management, Hsinchu 30015, Taiwan
关键词
AMHS; hot lot; OHT; semiconductor manufacturing; 300; mm;
D O I
10.1007/s00170-005-2610-4
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Highly automated materials handling in 300 mm semiconductor manufacturing is one of the biggest concerns to foundry practitioners because effective coordination among efficient manual operations has been the core competence in their 200 mm manufacturing successful stories. It is still very challenging to provide almost no-wait transport to hot lots (high priority lots) in an automatic materials handling production environment. This paper proposes an effective overhead hoist transport (OHT) dispatching rule, differentiated preemptive dispatching (DPD) policy, to reduce the possible blocking effects during the transportation of hot lots in a 300 mm OHT system. The dispatching objective is to minimize the delivery time of hot lots while minimizing the impact to the transport of normal lots. Simulation experiments based on realistic data from a local 300 mm foundry fab are conducted. Numerical results demonstrate that the DPD rule can effectively expedite the movements of hot lots. The proposed DPD rule is very useful to hot lots management and shop floor control functions, like scheduling and dispatching, in a 300 mm fab-wide automated production environment.
引用
收藏
页码:890 / 896
页数:7
相关论文
共 38 条
  • [1] Differentiated preemptive dispatching for automatic materials handling services in 300 mm semiconductor foundry
    Da-Yin Liao
    Chia-Nan Wang
    The International Journal of Advanced Manufacturing Technology, 2006, 29 : 890 - 896
  • [2] Differentiated preemptive dispatching for automatic materials handling services in 300 mm semiconductor foundry
    Liao, Da-Yin
    Wang, Chia-Nan
    International Journal of Advanced Manufacturing Technology, 2006, 29 (9-10): : 890 - 896
  • [3] Effective OHT dispatching for differentiated material handling services in 300mm wafer foundry
    Wang, CN
    Liao, DY
    2003 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS 1-3, PROCEEDINGS, 2003, : 1027 - 1032
  • [4] The Preemptive Stocker Dispatching Rule of Automatic Material Handling System in 300 mm Semiconductor Manufacturing Factories
    Wang, C. N.
    Lin, H. S.
    Hsu, H. P.
    Wang, Yen-Hui
    Chang, Y. P.
    4TH INTERNATIONAL CONFERENCE ON SCIENCE & ENGINEERING IN MATHEMATICS, CHEMISTRY AND PHYSICS 2016 (SCIETECH 2016), 2016, 710
  • [5] Prioritized automatic material handling services in 300mm foundry manufacturing
    Wang, CN
    Liao, DY
    2002 SEMICONDUCTOR MANUFACTURING TECHNOLOGY WORKSHOP, 2002, : 109 - 114
  • [6] THE HEURISTIC DISPATCHING METHOD OF AUTOMATIC MATERIAL HANDLING SYSTEM IN 300MM SEMICONDUCTOR FABRICATION
    Wang, Chia-Nan
    INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL, 2009, 5 (07): : 1927 - 1935
  • [7] Expeditious hot lots handling in 300mm semiconductor foundry
    Wang, Chia-Nan
    Liao, Da-Yin
    2006 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-6, PROCEEDINGS, 2006, : 4677 - +
  • [8] The heuristic preemptive dispatching method of material transportation system in 300 mm semiconductor fabrication
    Chia-Nan Wang
    Li-Chin Chen
    Journal of Intelligent Manufacturing, 2012, 23 : 2047 - 2056
  • [9] The heuristic preemptive dispatching method of material transportation system in 300 mm semiconductor fabrication
    Wang, Chia-Nan
    Chen, Li-Chin
    JOURNAL OF INTELLIGENT MANUFACTURING, 2012, 23 (05) : 2047 - 2056
  • [10] Vehicle clustering phenomenon in automatic materials handling systems in 300mm semiconductor manufacturing
    Department of Information Management, National Chi-Nan University, Puli, Nantou, 545, Taiwan
    Mater Sci Forum, PART 2 (1129-1134):