Optimizing Crew Rostering with Multilicense on High-Speed Railway Lines

被引:0
|
作者
Tian, Zhiqiang [1 ]
机构
[1] Lanzhou Jiaotong Univ, Sch Traff & Transportat, Lanzhou 730070, Peoples R China
基金
中国国家自然科学基金;
关键词
INDUSTRY; BOUNDS;
D O I
10.1155/2014/910569
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
This paper studies the crew rostering problem with the consideration of multilicense of crewmembers. A 0-1 integer programming model is established to minimize the number of crewmembers used and to maintain the working time balance and the income balance of crewmembers. The method for calculating the reasonable cycle schemes is designed by considering the parameters of monthly working time standard and the number and the average working time of crew routes. The order for selecting the optimal cycle scheme is then determined with consideration of the connection relationships between crew routes. According to the characteristics of the problem and the requirements in application, this paper presents the design of an improved ant colony algorithm for solving the optimization model. The reasonableness of the model and the effectiveness of the algorithm are verified by a numerical example with 43 generated crew routes.
引用
收藏
页数:10
相关论文
共 50 条
  • [1] Modeling and Algorithms of the Crew Rostering Problem with Given Cycle on High-Speed Railway Lines
    Tian, Zhiqiang
    Niu, Huimin
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2012, 2012
  • [2] Modeling and Algorithms of the Crew Scheduling Problem on High-speed Railway Lines
    Tian, Zhiqiang
    Song, Qi
    [J]. INTELLIGENT AND INTEGRATED SUSTAINABLE MULTIMODAL TRANSPORTATION SYSTEMS PROCEEDINGS FROM THE 13TH COTA INTERNATIONAL CONFERENCE OF TRANSPORTATION PROFESSIONALS (CICTP2013), 2013, 96 : 1443 - 1452
  • [3] Crew rostering for the High Speed Train
    Lentink, RM
    Odijk, MA
    van Rijn, E
    [J]. COMPUTERS IN RAILWAYS VIII, 2002, 13 : 521 - 528
  • [4] Study of Crew Scheduling System for High-speed Railway
    Guo, Bin
    Zhou, Leishan
    Li, Dandan
    [J]. ADVANCES IN COMPUTERS, ELECTRONICS AND MECHATRONICS, 2014, 667 : 72 - +
  • [5] Crew Planning Optimization Model of High-Speed Railway
    Li, Jinmei
    Nie, Lie
    [J]. SUSTAINABLE DEVELOPMENT OF INDUSTRY AND ECONOMY, PTS 1 AND 2, 2014, 869-870 : 298 - 304
  • [6] Optimizing adjustment plan on high-speed railway
    Nie, L
    Zhang, XC
    [J]. TRAFFIC AND TRANSPORTATION STUDIES, 1998, : 802 - 811
  • [7] Permanent way for high-speed railway lines
    Eisenmann, J.
    [J]. Eisenbahningenieur, 2001, 52 (09): : 38 - 42
  • [8] Solution of Multi-Crew Depots Railway Crew Scheduling Problems: The Chinese High-Speed Railway Case
    Zhao, Chunxiao
    Chen, Junhua
    Zhang, Xingchen
    Cui, Zanyang
    [J]. SUSTAINABILITY, 2022, 14 (01)
  • [9] Design of Dynamic SNS on the High-speed Railway: Virtual Crew Service
    Chung, Ki-Sook
    Keum, Changsup
    [J]. 2016 INTERNATIONAL CONFERENCE ON INFORMATION AND COMMUNICATION TECHNOLOGY CONVERGENCE (ICTC 2016): TOWARDS SMARTER HYPER-CONNECTED WORLD, 2016, : 411 - 413
  • [10] Crew scheduling and rostering problems in railway applications
    Caprara, A
    Fischetti, M
    Guida, PL
    Toth, P
    Vigo, D
    [J]. OPERATIONS RESEARCH AND DECISION AID METHODOLOGIES IN TRAFFIC AND TRANSPORTATION MANAGEMENT, 1998, 166 : 228 - 243