An alternative optimal solution technique for a single-vendor single-buyer integrated production inventory model

被引:13
|
作者
Hoque, M. A. [1 ]
机构
[1] Univ Brunei Darussalam, Dept Math, Bandar Seri Begawan, Brunei
关键词
integrated production; inventory; convexity; optimal; STOCHASTIC DEMAND; LEAD TIME; POLICY; SYSTEM;
D O I
10.1080/00207540801905478
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
For the single-vendor single-buyer integrated production inventory problem, the lot is transferred by some researchers in shipments of equal and/or unequal sizes. For a given total number (n) of shipments, the minimal number (m) of unequal sized shipments is selected satisfying a constraint. Due to the complex dependence of m on n, there remained a conjecture about the convexity of the total cost (C) in n. Consequently, for a known n, lower and upper bounds on the minimal total cost are imposed and this cost is obtained through a search over n based on the convexity of C in the lot size (Q). Here it is demonstrated that m thus selected might not be the minimal and a method for obtaining the minimal m is developed. A formula for the minimal n based on the convexity of C in n (given m and Q) is also derived. Integrating the ways of finding the minimal m and n, along with the convexity of C in Q, an alternative minimal cost solution technique is presented. Finally, a comparative theoretical analysis of the methods along with numerical illustration is carried out to show the efficiency of our method.
引用
收藏
页码:4063 / 4076
页数:14
相关论文
共 50 条