Maintenance and inspection of stay cables using prestressing steel at a German bridge

被引:0
|
作者
Glaeser, Christian [1 ]
Weiher, Hermann [1 ]
机构
[1] Tech Univ Munich, Dept Concrete Struct, Munich, Germany
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the past all large stay cable bridges in Germany were built with locked wire ropes. For a new project, Ziegelgraben-Bridge crossing the "Strelasound", the contract award also had allowed offers with stay cables using prestressing strands for tendoring. Before executing the bridges with stay cables using prestressing strands special requirements for the life time of the bridge were defined to ensure the durability and sustainability of the structure. The exchangeability of a stay cable as well as of a single strand has to be possible. The possibility for load measurements has to be given. Ducts and corrosion protection systems shall be visitable. Exchangeability had to be verified with special tests. For load measuring direct (lock-off-test) and indirect methods (vibration analysis) were applied. For vibration analysis reference measurements were performed after completion of the bridges. As most of the ducts of stay cables using prestressing steel have an outer helix to reduce vibrations common methods for visual inspection with cameras had to be modified. After the test methods had been planned a maintenance manual was created which defines the inspection periods as well as type and number of tests for the inspection period. By this an effective maintenance of the stay cables with adequate durability and safety shall be guaranteed.
引用
收藏
页码:553 / +
页数:3
相关论文
共 50 条
  • [1] Inspection and maintenance of Severn Bridge suspension cables
    Young, J. S.
    Lynch, M. J.
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2010, 163 (04) : 173 - 180
  • [2] The second bridge crossing the Strelasund -: Germany's first application of stay cables using prestressing strands
    Glaeser, Ch.
    Scheibe, M.
    Zilch, K.
    [J]. BAUINGENIEUR, 2007, 82 : 170 - 176
  • [3] The computerized cables stay inspection of the Cooper River Bridge (Arthur Ravanel, Jr)
    Kroely, B.
    Hovhanessian, G.
    Stieb, J.
    [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE-CYCLE OPTIMIZATION, 2010, : 628 - +
  • [4] Subsequent anchorage of transverse prestressing cables in bridge decks
    Fust, Ch.
    Mark, P.
    Wolff, M.
    [J]. BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, RESILIENCE AND SUSTAINABILITY, 2012, : 867 - 873
  • [5] Eliminating bridge piers using stay cables with unconventional layouts
    Ruiz-Teran, A. M.
    Aparicio, A. C.
    [J]. TAILOR MADE CONCRETE STRUCTURES: NEW SOLUTIONS FOR OUR SOCIETY, 2008, : 147 - 147
  • [6] Special inspection and maintenance design of inclined legged steel bridge
    Yadav, R.
    Chen, B.
    Huihui, Y.
    [J]. MAINTENANCE, MONITORING, SAFETY, RISK AND RESILIENCE OF BRIDGES AND BRIDGE NETWORKS, 2016, : 531 - 531
  • [7] Effect of stainless steel sleeve on magnetostrictive guided wave inspection for bridge cables
    [J]. 1600, Huazhong University of Science and Technology (45):
  • [8] Inspection of surface defects on stay cables using a robot and transfer learning
    Hou, Shitong
    Dong, Bin
    Wang, Haochen
    Wu, Gang
    [J]. AUTOMATION IN CONSTRUCTION, 2020, 119
  • [9] Development of Inspection Robots for Bridge Cables
    Yun, Hae-Bum
    Kim, Se-Hoon
    Wu, Liuliu
    Lee, Jong-Jae
    [J]. SCIENTIFIC WORLD JOURNAL, 2013,
  • [10] Development of inspection robots for bridge cables
    Yun, Hae-Bum
    Kim, Se-Hoon
    Wu, Liuliu
    Lee, Jong-Jae
    [J]. Rivista Italiana della Saldatura, 2016, 68 (01): : 59 - 76