Note on Shim and Kim's lower bounds for scheduling on identical parallel machines to minimize total tardiness

被引:10
|
作者
Schaller, Jeffrey [1 ]
机构
[1] Eastern Connecticut State Univ, Dept Business Adm, Willimantic, CT 06226 USA
关键词
Scheduling; Branch-and-bound; Lower bound; Parallel machines;
D O I
10.1016/j.ejor.2008.07.005
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This note introduces a new lower bound for the problem of scheduling on parallel identical machines to minimize total tardiness that is based on the concepts used in the two lower bounds developed by Shim and Kim [Shim, S.O., Kim, Y.D., 2007. Scheduling on parallel identical machines to minimize total tardiness. European Journal of Operational Research 177, 135-146]. The note shows that the new lower bound dominates the three lower bounds used in Shim and Kim's branch-and-bound algorithm and can be used in place of these lower bounds to lower the enumeration required. (C) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:422 / U5
页数:6
相关论文
共 50 条
  • [1] Scheduling identical parallel machines to minimize total tardiness
    Biskup, Dirk
    Herrmann, Jan
    Gupta, Jatinder N. D.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 115 (01) : 134 - 142
  • [2] Scheduling on parallel identical machines to minimize total tardiness
    Shim, Sang-Oh
    Kim, Yeong-Dae
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 177 (01) : 135 - 146
  • [3] Scheduling identical parallel machines with fixed delivery dates to minimize total tardiness
    Mensendiek, Arne
    Gupta, Jatinder N. D.
    Herrmann, Jan
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 243 (02) : 514 - 522
  • [4] Metaheuristics for Identical Parallel Machines Scheduling to Minimize Mean Tardiness
    Kaid, Husam
    Alharkan, Ibrahim
    Ghaleb, Atef
    Ghaleb, Mageed A.
    [J]. 2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND OPERATIONS MANAGEMENT (IEOM), 2015,
  • [5] SCHEDULING WITH PARALLEL MACHINES TO MINIMIZE TOTAL JOB TARDINESS
    LIN, K
    [J]. ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1981, 5 (04): : 289 - 296
  • [6] Tabu search for scheduling on identical parallel machines to minimize mean tardiness
    Vinı´cius A. Armentano
    Denise S. Yamashita
    [J]. Journal of Intelligent Manufacturing, 2000, 11 : 453 - 460
  • [7] Tabu search for scheduling on identical parallel machines to minimize mean tardiness
    Armentano, VA
    Yamashita, DS
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2000, 11 (05) : 453 - 460
  • [8] Scheduling unrelated parallel machines to minimize total weighted tardiness
    Na, Dong-Gil
    Kim, Dong-Won
    Jang, Wooseung
    Chen, F. Frank
    [J]. 2006 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS (SOLI 2006), PROCEEDINGS, 2006, : 758 - +
  • [9] Scheduling parallel machines to minimize total weighted and unweighted tardiness
    Alidaee, B
    Rosa, D
    [J]. COMPUTERS & OPERATIONS RESEARCH, 1997, 24 (08) : 775 - 788
  • [10] Scheduling unrelated parallel machines to minimize total weighted tardiness
    Liaw, CF
    Lin, YK
    Cheng, CY
    Chen, MC
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2003, 30 (12) : 1777 - 1789