Concrete Arch Dam's Foundation Interception Range Analysis

被引:0
|
作者
Cheng Zhongkai [1 ]
Ding Yuemei [1 ]
Huang Yaoying [1 ]
Li Xiuwen [1 ]
机构
[1] China Three Gorges Univ, Coll Hydraul & Environm Engn, Yichang 443002, Peoples R China
关键词
Foundation Size; Upstream Reservoir Water Load; Finite Element; Concrete Arch Dam;
D O I
10.1109/ICDMA.2013.86
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
There is big difference in the foundation size selection of the concrete arch dam considering the upstream reservoir water load, so the 3-D FEM is constructed with the typical high arch dam in 300 m class in this paper, to analyze the displacement and stress under the condition that foundation depth and left and right banks foundation size are fixed, with the upstream and downstream foundation size changing, and the condition that the foundation depth, left and right banks and upstream and downstream foundation size take the same value and increased correspondingly. Analysis shows that: (1) when the water pressure only loads on the dam, the stress and displacement tend to be stable with the increase of the foundation size. (2) considering the upstream reservoir basin water load, the stress tends to be stable with the foundation size increasing; the displacement tends to be stable with the increase of the upstream and downstream foundation size under the condition of the foundation depth and left and right banks foundation size are fixed; while the displacement can't tend to be stable under the condition of the foundation depth, left and right banks and upstream and downstream foundation size take the same value and increase correspondingly. (3) the actual foundation size is limited, if the foundation depth and left and right banks foundation size are fixed and taking the same value and no more than 40 times of the dam height, the displacement and stress of the dam has been able to meet the engineering precision or achieve stability when the upstream and downstream foundation size select 5 - 10 times of the dam height.
引用
收藏
页码:370 / 373
页数:4
相关论文
共 50 条
  • [1] Application of MgO Concrete in China Dongfeng Arch Dam Foundation
    Chen, Changli
    Tang, Chengshu
    Zhao, Zhenhua
    ADVANCES IN BUILDING MATERIALS, PTS 1-3, 2011, 168-170 : 1953 - +
  • [2] Modal analysis of concrete arch dam-reservoir-massed foundation system in frequency domain
    Farzad, Reza
    Lotfi, Vahid
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-STRUCTURES AND BUILDINGS, 2023, 176 (04) : 244 - 256
  • [3] Analysis of foundation sliding of an arch dam considering the hydromechanical behavior
    Braga Farinha, Maria Luisa
    de Lemos, Jose Vieira
    Maranha Das Neves, Emanuel
    FRONTIERS OF STRUCTURAL AND CIVIL ENGINEERING, 2012, 6 (01) : 35 - 43
  • [4] Analysis of foundation sliding of an arch dam considering the hydromechanical behavior
    Maria Luísa Braga Farinha
    José Vieira de Lemos
    Emanuel Maranha Das Neves
    Frontiers of Structural and Civil Engineering, 2012, 6 (1) : 35 - 43
  • [5] BACK ANALYSIS OF SEEPAGE PARAMETERS OF HIGH ARCH DAM FOUNDATION
    Guo Lei
    Li Hanwu
    Dao Vanhung
    PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON INSPECTION APPRAISAL REPAIRS AND MAINTENANCE OF STRUCTURES, VOLS 1 AND 2, 2010, : 349 - +
  • [6] Influences of foundation deformation modulus to stress distribution of roller compacted concrete arch dam
    Wang, Liang-Qing
    Tang, Hui-Ming
    Hu, Xin-Li
    Zhang, Yi-Hu
    Xia, Yuan-You
    Liang, Ye
    Yang, You-Cheng
    Wu, Qiong
    Diqiu Kexue - Zhongguo Dizhi Daxue Xuebao/Earth Science - Journal of China University of Geosciences, 2007, 32 (03): : 409 - 414
  • [7] Back analysis in the interpretation of concrete dam foundation behavior
    Castro, AT
    Lemos, JV
    GEOECOLOGY AND COMPUTERS, 2000, : 191 - 198
  • [8] Chang law analysis of the horizontal displacement of the arch crest dam section of the Geheyan concrete gravity arch dam
    Li, Bo
    Liu, Lili
    Li, Dazhi
    Liang, Jun
    PROGRESS IN CIVIL ENGINEERING, PTS 1-4, 2012, 170-173 : 2013 - 2016
  • [9] Back analysis of seepage field of Ertan high arch dam foundation
    Cui Hao-dong
    Zhu Yue-ming
    ROCK AND SOIL MECHANICS, 2009, 30 (10) : 3194 - 3199
  • [10] Block theory techniques used in arch dam foundation stability analysis
    U.S. Department of the Interior, Bureau of Reclamation, Denver
    CO
    80225, United States
    Int. J. Rock Mech. Min. Sci., 3-4 (163.e1-163.e19):