Application of a hybrid approach based on artificial neural network and genetic algorithm to job-shop scheduling problem

被引:0
|
作者
Zhao, Fuqing [1 ]
Hong, Yi [1 ]
Yu, Dongmei [1 ]
Yang, Yahong [1 ]
机构
[1] Lanzhou Univ Technol, Sch Comp & Commun, Lanzhou 730050, Peoples R China
关键词
job-shop scheduling; artificial neural network; genetic algorithm; optimization;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
Job-shop scheduling, problem (JSSP) is very common in a discrete manufacturing environment. It deals with multi-operation models, which are different from the flow shop models. There are some difficulties that make this problem difficult. Firstly, it is highly constrained problem that changes from shop to shop. Secondly, its decision mainly depends on other decision which are not isolated from other functions. It is an NP-hard problem. This paper proposes a new hybrid approach, combining ANN and GA, for job-shop scheduling. The GA is used for optimization of sequence, neural network (NN) is used for optimization of operation start times with a fixed sequence, thanks to the NN's parallel computability and the GA's searching efficiency, the computational ability of the hybrid approach is strong enough to deal with complex scheduling problems. The results indicate that the proposed algorithm can obtain satisfactory for the Job-shop scheduling problem.
引用
收藏
页码:2630 / 2639
页数:10
相关论文
共 50 条
  • [1] A hybrid approach based on artificial neural network and genetic algorithm for job-shop scheduling problem
    Zhao, FQ
    Hong, Y
    Yu, DM
    Yang, YH
    PROCEEDINGS OF THE 2005 INTERNATIONAL CONFERENCE ON NEURAL NETWORKS AND BRAIN, VOLS 1-3, 2005, : 1687 - 1692
  • [2] Neural network and genetic algorithm-based hybrid approach to expanded job-shop scheduling
    Yu, HB
    Liang, W
    COMPUTERS & INDUSTRIAL ENGINEERING, 2001, 39 (3-4) : 337 - 356
  • [3] A Hybrid Genetic Algorithm for Job-Shop Scheduling Problem
    Wang Lihong
    Ten Haikun
    Yu Guanghua
    2015 IEEE 28TH CANADIAN CONFERENCE ON ELECTRICAL AND COMPUTER ENGINEERING (CCECE), 2015, : 271 - 274
  • [4] Integration of artificial neural networks and genetic algorithm for job-shop scheduling problem
    Zhao, FQ
    Hong, Y
    Yu, DM
    Chen, XH
    Yang, YH
    ADVANCES IN NEURAL NETWORKS - ISNN 2005, PT 1, PROCEEDINGS, 2005, 3496 : 770 - 775
  • [5] Scheduling for the Flexible Job-Shop Problem Based on a Hybrid Genetic Algorithm
    Wang, JinFeng
    Fan, XiaoLiang
    SENSOR LETTERS, 2011, 9 (04) : 1520 - 1525
  • [6] Hybrid genetic algorithm for solving job-shop scheduling problem
    Hasan, S. M. Kamrul
    Sarker, Ruhul
    Cornforth, David
    6TH IEEE/ACIS INTERNATIONAL CONFERENCE ON COMPUTER AND INFORMATION SCIENCE, PROCEEDINGS, 2007, : 519 - +
  • [7] A hybrid and flexible genetic algorithm for the job-shop scheduling problem
    Ferrolho, Antonio
    Crisostomo, Manuel
    2007 INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE IN ROBOTICS AND AUTOMATION, 2007, : 178 - +
  • [8] A Hybrid Genetic Algorithm for Flexible Job-shop Scheduling Problem
    Wang Shuang-xi
    Zhang Chao-yong
    Jin Liang-liang
    ENGINEERING SOLUTIONS FOR MANUFACTURING PROCESSES IV, PTS 1 AND 2, 2014, 889-890 : 1179 - 1184
  • [9] Neural network and genetic algorithm-based hybrid approach to dynamic job shop scheduling problem
    Li, Ye
    Chen, Yan
    2009 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS (SMC 2009), VOLS 1-9, 2009, : 4836 - 4841
  • [10] Application of immune genetic algorithm in job-shop scheduling problem
    Xu, Xiaodong
    Li, Congxin
    Dongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Southeast University (Natural Science Edition), 2006, 36 (03): : 437 - 441