共 9 条
Evaluation of HUD-funded lead hazard control treatments at 6 years post-intervention
被引:22
|作者:
Wilson, Jonathan
Pivetz, Tim
Ashley, Peter
Jacobs, David
Strauss, Warren
Menkedick, John
Dixon, Sherry
Tsai, Hsing-Chuan
Brown, Vincent
Friedman, Warren
Galke, Warren
Clark, Scott
机构:
[1] Natl Ctr Healthy Housing, Columbia, MD 21044 USA
[2] Battelle Mem Inst, Columbus, OH 43201 USA
[3] US Dept Housing & Urban Dev, Off Healthy Homes & Lead Hazard Control, Washington, DC USA
[4] Univ Cincinnati, Dept Environm Hlth, Cincinnati, OH USA
关键词:
interior dust lead levels;
lead poisoning;
HUD lead hazard control grant program;
lead-based paint;
D O I:
10.1016/j.envres.2006.04.007
中图分类号:
X [环境科学、安全科学];
学科分类号:
08 ;
0830 ;
摘要:
The Evaluation of the HUD Lead-Based Paint Hazard Control Grant Program (Evaluation) was a HUD-fanded study of the effectiveness of lead hazard control (LHC) treatments conducted by 14 grantees ill Communities across the country. A stratified random sampling scheme was used to select treated units at four grantee sites for continued environmental assessment at 6 years post-intervention. The study compared the relative effectiveness after 6 years of the different classes of interventions used by the grantees, after controlling for such factors as housing conditions and characteristics and resident and neighborhood characteristics. Geometric mean dust-lead levels on floors and window sills were 11% and 23% lower, respectively, at 6 years post-intervention than at any preceding point following the intervention. Although geometric mean window trough dust-lead levels were slightly higher at 6 years post-intervention than at other post-intervention time periods, they were still over 75% lower than before intervention. Treatment at more-intensive levels was associated with lower window sill and window trough dust-lead levels; however, statistical modeling found no significant difference in floor dust-lead loadings over time between the levels of treatment; however, significant differences in window sill and window trough dust-lead levels between treatment levels were evident. Findings from the 6-Year Extension study indicate that across all arantees and treatment strategies the treatments applied were effective at significantly reducing environmental lead levels on floors, window sills. and window troughs at least 6 years following the intervention. (c) 2006 Elsevier Inc. All rights reserved.
引用
收藏
页码:237 / 248
页数:12
相关论文