Evaluation of Track Geometry on a Long Span Steel Trussed Cable-stayed Bridge

被引:0
|
作者
Xu, Jinhui [1 ]
Wang, Biao [1 ]
Wang, Li [1 ]
Wang, Ping [1 ]
机构
[1] Southwest Jiaotong Univ, MOE Key Lab High Speed Railway Engn, Chengdu 610031, Peoples R China
关键词
Cable-stayed Bridge; Steel Truss Bridge; Track Geometry; Finite Element Analysis;
D O I
10.4028/www.scientific.net/AMM.501-504.1403
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In order to investigate the track geometry on a long span steel trussed cable-stayed bridge, in this paper, a plane model is built include suspension cable, pylons, floating system and so on based on FEM to calculate the track geometry under temperature load, wind load and train load. Then evaluate the track geometry from the aspects of line profile and track static geometry size deviation. The result shows that the track geometry indicators like vertical curve radius, gradients and static geometric deviation under temperature load and wind load are better than the indicators under train load. The maximum values of track geometry indicators are all appeared in the bridge piers, mainly because the support stiffness is great different between in the bridge pier and in the mid-span cross-section. It is suggested that the flexibility of piers should be appropriate increased to reduce the support stiffness mutation.
引用
收藏
页码:1403 / 1407
页数:5
相关论文
共 50 条
  • [1] Buckling analysis of a long span steel cable-stayed bridge
    Wei, Y.
    He, Y. T.
    Ruan, X.
    Ding, L.
    LIFE-CYCLE ANALYSIS AND ASSESSMENT IN CIVIL ENGINEERING: TOWARDS AN INTEGRATED VISION, 2019, : 1387 - 1391
  • [2] Engineering Practice of Laying Ballastless Track on Long Span Cable-stayed Bridge
    大跨度斜拉桥上铺设无砟轨道工程实践
    Li, Diping, 1600, Editorial Department of Journal of Railway Engineering Society (37):
  • [3] Local disengaging and optimization of ballastless track on long span steel truss girder cable-stayed bridge
    Li, Yong-Le
    Xia, Fei-Long
    Li, Long
    Wan, Tian-Bao
    Sheng, Li-Ming
    Bridge Construction, 2013, 43 (06) : 27 - 33
  • [4] Condition assessment of long span cable-stayed bridge
    Wu H.-C.
    Xiang Y.-Q.
    Wang J.-F.
    Journal of Zhejiang University-SCIENCE A, 2006, 7 (Suppl 2): : 297 - 308
  • [5] Mechanical behavior and track geometry evaluation of long-span cable-stayed bridges with ballastless tracks
    Zhu, Zhihui
    Ren, Zengzhen
    Zheng, Weiqi
    Liu, Wenshuo
    Li, Diping
    Ma, Guang
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2024,
  • [6] Construction control of long span steel box girder cable-stayed bridge
    Yue, Qing
    Yan, He-Zhong
    Que, Shui-Jie
    Liu, Hua
    Qin, Zhao-Fu
    Bridge Construction, 2013, 43 (04) : 54 - 60
  • [7] Interaction between Track and Long-Span Cable-Stayed Bridge: Recommendations for Calculation
    Xie, Kaize
    Zhao, Weigang
    Cai, Xiaopei
    Wang, Ping
    Zhao, Jia
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2020, 2020 (2020)
  • [8] Deformation Adaptability of Long-Span Cable-Stayed Bridge and Ballastless Track Structure
    Zhu Z.
    Yan M.
    Li X.
    Sheng X.
    Gao Y.
    Yu Z.
    Zhongguo Tiedao Kexue/China Railway Science, 2019, 40 (02): : 16 - 24
  • [9] Super-long-span bridge with cable-stayed bridge and suspension bridge
    Wang, HJ
    Shioi, Y
    Hasegawa, A
    STRUCTURAL ENGINEERING AND MECHANICS, VOLS 1 AND 2, 1999, : 1589 - 1594
  • [10] Ambient vibration of long-span cable-stayed bridge
    Chang, C.C.
    Chang, T.Y.P.
    Zhang, Q.W.
    Journal of Bridge Engineering, 2001, 6 (01) : 46 - 53