Integrating and transitioning the project front-end and project initiation phases in South African electrical engineering industrial projects

被引:0
|
作者
Siriram, Rajenlall [1 ]
机构
[1] Univ Witwatersrand, Fac Engn & Built Environm, Sch Mech Ind & Aeronaut Engn, Johannesburg, South Africa
关键词
Integration; Transitioning; Project business; CROSS-FUNCTIONAL INTEGRATION; LIFE-CYCLE; MANAGEMENT; COLLABORATION; PERFORMANCE; LINKING; SALES; CREATION; ISLAND; MODEL;
D O I
10.1108/IJMPB-04-2022-0094
中图分类号
F [经济];
学科分类号
02 ;
摘要
PurposeThe objective of this research is to explore integration and transition activities in large industrial projects. The purpose is to (a) obtain a better understanding of the integration and transition activities between the project front-end (FE) and project initiation phases (PIPs), (b) explore what, how and when these integrations and transitions occur, and (c) explore what the integration and transition activities mean to project practitioners.Design/methodology/approachA qualitative research design methodology is followed, based on interviews using open-ended questions. An expert panel is used to provide responses to questions pertaining to the integration and transition between the project FE and PIP. The research is focused on managing large projects in the South African electrical engineering industrial projects industry. A literature review combined with empirical analysis reflects the importance of integrating and transitioning in project business.FindingsThe findings provide guidance to researchers and practitioners on integration and transition mechanisms, how and when these occur. It highlights the benefits of integration and transition activities. Important lessons for researchers and practitioners are provided together with areas for future research.Originality/valueThis is an interpretative analysis of expert opinion. Expert panel members are experienced at senior decision-making level, and their expertise was accessed based on experience, education and knowledge. This extensive experience is shared in this paper providing insights into their opinions, experiences, success and failures. These inputs together with the literature review provide interesting implications for both a theoretical foundation as well as practical implications for practitioners.
引用
收藏
页码:1 / 26
页数:26
相关论文
共 11 条
  • [1] Method for Base Estimation of Construction Time for Linear Projects in Front-end Project Phases
    Dunovic, Ivana Burcar
    Prebanic, Kristijan Robert
    Durrigl, Pavao
    [J]. ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 2021, 13 (01): : 2312 - 2326
  • [2] Front-end definition of projects: Ten paradoxes and some reflections regarding project management and project governance
    Samset, Knut
    Volden, Gro Holst
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (02) : 297 - 313
  • [3] Research Of Web Front-end Engineering Solution In Public Cultural Service Project
    Zhang, Ning
    Cao, Yizhen
    Zhang, Shengyan
    [J]. 2017 16TH IEEE/ACIS INTERNATIONAL CONFERENCE ON COMPUTER AND INFORMATION SCIENCE (ICIS 2017), 2017, : 623 - 626
  • [4] A Conceptual Framework for the Assessment of Project Alternatives in the Front-End Phase of Major Transportation Projects
    Mahmoud, Nahid Vesali
    Bayraktar, Mehmet Emre
    Ozen, Halit
    [J]. CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, 2016, : 1383 - 1392
  • [5] Stakeholder Dynamics During the Project Front-End: The Case of Nuclear Waste Repository Projects
    Aaltonen, Kirsi
    Kujala, Jaakko
    Havela, Laura
    Savage, Grant
    [J]. PROJECT MANAGEMENT JOURNAL, 2015, 46 (06) : 15 - 41
  • [6] Projects as drivers of sustainability: How the adoption of the reuse principle affects the front-end of a construction project
    Rokio, Matias
    Ahola, Tuomas
    Alkki, Lauri
    Ståhle, Matias
    [J]. International Journal of Project Management, 2024, 42 (07)
  • [7] Front End Engineering Design (FEED) for Large Industrial Projects: FEED Maturity and Its Impact on Project Cost and Schedule Performance
    Yussef, Abdulrahman
    Gibson, G. Edward, Jr.
    El Asmar, Mounir
    Ramsey, David
    [J]. CONSTRUCTION RESEARCH CONGRESS 2018: INFRASTRUCTURE AND FACILITY MANAGEMENT, 2018, : 1 - 8
  • [8] Front-End Planning for Large and Small Infrastructure Projects: Comparison of Project Definition Rating Index Tools
    Elzomor, Mohamed
    Burke, Rebekah
    Parrish, Kristen
    Gibson, G. Edward, Jr.
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2018, 34 (04)
  • [9] Enabling projects for strategic implementation: Role of designated project manager in CEO-TMT interface during project front-end investment decisions
    Yang, Xiaotian
    He, Bei
    Wang, Linzhuo
    Yu, Miao
    Zhu, Fangwei
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2021, 39 (06) : 620 - 632
  • [10] A systematic literature review on characteristics of the front-end phase of agile software development projects and their connections to project success
    Jorgensen, Magne
    [J]. JOURNAL OF SYSTEMS AND SOFTWARE, 2024, 216