The 3PLP's Effort Level and Incentive Mechanism from Manufacturer's Perspective

被引:0
|
作者
Han, Min [1 ]
Zong, Tao [1 ]
机构
[1] Xian Univ Sci & Technol, Sch Mech Engn, Xian 710054, Shanxi, Peoples R China
关键词
D O I
10.1109/ICIII.2008.219
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The author investigates the relationship between the degrees of effort of third part Logistics Provider (3PLP) and the manufacturer's incentive mechanism, which was analyzed using two-period model and from the perspective of manufacturer. Several circumstances were considered and discussed integrated, which were single and double type of 3PLP, long term or short term cooperation relationship scheme, and even manufacturer prefers long term profit or short term profit. The result shows that the manufacturer which emphasizes long term profit will provide the 3PLP with a higher incentive than a short term profit preferred manufacturer in the first period A long (short)-term cooperation is more suitable if the value of the farsighted manufacturer under a long-term relationship is greater (less) than the switching option value under a short-term relationship view. And some circumstance and condition in which long term or short term contract is better was given.
引用
收藏
页码:166 / 171
页数:6
相关论文
共 50 条
  • [1] Studies on incentive mechanism adjusting entrepreneur's producing effort and sharing effort
    Cheng, CP
    Xie, KF
    Wei, MX
    Tian, WJ
    PROCEEDINGS OF THE 2001 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, VOLS I AND II, 2001, : 1220 - 1224
  • [2] Manufacturer's perspective
    Moorhead, John R.
    Form, 37 (06):
  • [3] The manufacturer's perspective
    Roehrig, J
    BRITISH JOURNAL OF RADIOLOGY, 2005, 78 : S41 - S45
  • [4] Manufacturer's perspective
    Form, (08):
  • [5] Manufacturer's perspective
    Moorhead, John R.
    Form, 37 (07):
  • [6] Commentary: Omnichannel from a Manufacturer's Perspective
    Ailawadi, Kusum L.
    JOURNAL OF MARKETING, 2021, 85 (01) : 121 - 125
  • [7] The Manufacturer's Incentive to Reduce Lead Times
    Kraiselburd, Santiago
    Pibernik, Richard
    Raman, Ananth
    PRODUCTION AND OPERATIONS MANAGEMENT, 2011, 20 (05) : 639 - 653
  • [8] Safety: a manufacturer's perspective
    Wierenga, Elisabeth J.
    PERFUSION-UK, 1997, 12 (04): : 229 - 231
  • [9] The incentive mechanism design for promotion effort considering the retailer's fairness preference
    Pu, Xu-Jin
    Gong, Lei
    Zhang, Xing
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2015, 35 (09): : 2271 - 2279
  • [10] Surface mount from a contract manufacturer's perspective
    Fraser, Bill
    Surface mount technology, 1991, 5 (08):