Exact algorithms for production planning in mining considering the use of stockpiles and sequencing of power shovels in open-pit mines

被引:4
|
作者
Flores-Fonseca, Cesar [1 ]
Linfati, Rodrigo [2 ]
Escobar, John Willmer [3 ]
机构
[1] Univ Bio Bio, Sch Ind Engn, Concepcion 4030000, Chile
[2] Univ Bio Bio, Dept Ind Engn, Concepcion 4030000, Chile
[3] Univ Valle, Dept Accounting & Finance, Cali 760001, Colombia
关键词
Mine planning; Production scheduling; Stockpile; Power shovel sequencing; Mixed integer linear programming; Net present value (NPV); DESIGN;
D O I
10.1007/s12351-020-00618-x
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Chile is the world's leading producer of copper, with a market share of 26.8% and accounting for approximately 10% of the gross domestic product. Given the importance of this industrial sector in the country, mine planning is a fundamental tool for achieving strategic, tactical and operational goals. This paper proposes methods to solve the problem of scheduling production in mining, considering the storage and sequencing of power shovels in open-pit mines. The first problem is tactical and operational and seeks to determine the extraction period and destination of each block. The second problem is of an operational nature and consists of defining the optimal sequence of block extraction, considering the mining power shovels. To solve both problems, two mixed integer linear programming models have been proposed and tested in real and random structured instances. The objective function of the proposed models is to maximize the net present value (NPV) of scheduling and maximize the work efficiency of the power shovels in the extraction. The proposed models have been implemented in AMPL and have been solved through the IBM CPLEX and Gurobi solvers. The results show the efficiency of the proposed models, demonstrating that including the storage option in the production schedule increases the operational NPV.
引用
收藏
页码:2529 / 2553
页数:25
相关论文
共 25 条
  • [1] Exact algorithms for production planning in mining considering the use of stockpiles and sequencing of power shovels in open-pit mines
    César Flores-Fonseca
    Rodrigo Linfati
    John Willmer Escobar
    Operational Research, 2022, 22 : 2529 - 2553
  • [2] A push-back sequencing model for production planning in open-pit coal mining
    Gu Xiaowei
    Wang Pengfei
    Wang Qing
    Zheng Youyi
    Liu Jianping
    Chen Bin
    COMPUTER-AIDED DESIGN, MANUFACTURING, MODELING AND SIMULATION, PTS 1-2, 2011, 88-89 : 219 - +
  • [3] Multiobjective Evolutionary Algorithms for Operational Planning Problems in Open-Pit Mining
    Alexandre, Rafael F.
    Campelo, Felipe
    Vasconcelos, Joao A.
    PROCEEDINGS OF THE 2017 GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE COMPANION (GECCO'17 COMPANION), 2017, : 259 - 260
  • [4] Integrated Optimization of Production Scheduling and Haulage Route Planning in Open-Pit Mines
    Xu, Changyou
    Chen, Gang
    Lu, Huabo
    Zhang, Qiuxia
    Liu, Zhengke
    Bian, Jing
    MATHEMATICS, 2024, 12 (13)
  • [5] Collaborative Production Planning Based on an Intelligent Unmanned Mining System for Open-Pit Mines in the Industry 4.0 Era
    Liu, Kui
    Mei, Bin
    Li, Qing
    Sun, Shuai
    Zhang, Qingping
    MACHINES, 2024, 12 (06)
  • [6] PRODUCTION EFFICIENCY EVALUATION OF OPEN-PIT COAL MINES CONSIDERING ENVIRONMENT AND SAFETY FACTORS
    Chen Xin-Huan
    Shi Ru-Yi
    JOURNAL OF ENVIRONMENTAL PROTECTION AND ECOLOGY, 2021, 22 (05): : 1880 - 1887
  • [7] A Comparative Study of Algorithms for Solving the Multiobjective Open-Pit Mining Operational Planning Problems
    Alexandre, Rafael Frederico
    Campelo, Felipe
    Fonseca, Carlos M.
    de Vasconcelos, Joao Antonio
    EVOLUTIONARY MULTI-CRITERION OPTIMIZATION, PT II, 2015, 9019 : 433 - 447
  • [8] Dynamic shovel allocation approach to short-term production planning in open-pit mines
    Upadhyay, Shiv Prakash
    Askari-Nasab, Hooman
    INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2019, 33 (01) : 1 - 20
  • [9] Heuristic and Exact Approaches to Optimize the Production Scheduling of Mines Transitioning from the Open-Pit to Block Caving
    Anani, Angelina
    Flores, Ignacio Ortiz
    Li, Haitao
    Jalilzadeh, Afrooz
    MINING METALLURGY & EXPLORATION, 2024, : 3769 - 3787
  • [10] Green and climate-smart mining: A framework to analyze open-pit mines for cleaner mineral production
    Jiskani, Izhar Mithal
    Cai, Qingxiang
    Zhou, Wei
    Shah, Syed Ahsan Ali
    RESOURCES POLICY, 2021, 71