Post-disaster housing reconstruction for sustainable risk reduction in Peru

被引:0
|
作者
Ferradas, Pedro [1 ]
机构
[1] ITDG, Lima 18, Peru
关键词
reconstruction; risk management; disasters; construction technology; Peru;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Intermediate Technology Development Group (ITDG) recently completed the systematisation of their reconstruction projects which were implemented between the early 1990s and the year 2003 in the poor areas of Peru affected by disasters or internal war. Within these projects, technological housing reconstruction schemes were designed and validated as port of on effort to reduce the vulnerability of the affected population. 7,300 houses were built during 5 years; 600 houses between April 7 1992 and April 7 994 and 700 houses between July 200 7 and July 2003. The key factors for successful risk reduction identified during post-disaster reconstruction were: the location of reconstructed housing, the construction procedures and materials employed, the improvement of people's self-construction techniques, and the improvement of local risk-management skills. ITDG's first experience in Alto Mayo during the early 1990s involved participatory management at a local level and the use of the so-called improved "wattle and daub technology" (i.e. structural reinforcement of mud, wood and cone buildings). This technique is more earthquake-proof than the construction technology predominating in Peru (i.e. cement and iron-bosed structures). The experience in Ayacucho, which concluded in 200 7, provided the opportunity to apply the so-called "improved adobe technique" (i.e. structural reinforcement of mud buildings), as well as to install community water supply systems. The reconstruction work in Moquegua and Tacna, completed in 2003, was based on the organisation of workshops geared towards encouraging the participation of women in the use of various housing construction technologies and providing the facilities for them to adopt such technologies to traditional architecture. This article highlights the ITDG approach and experiences to past-disaster reconstruction: the main activities carried out in preparation for and during the implementation of the projects, the lessons obtained during these experiences, and the monitoring and evaluation procedures recommended for future reconstruction projects.
引用
收藏
页码:39 / 46
页数:8
相关论文
共 50 条
  • [1] Allocation of post-disaster reconstruction financing to housing
    Freeman, PK
    BUILDING RESEARCH AND INFORMATION, 2004, 32 (05): : 427 - 437
  • [2] A framework for managing post-disaster housing reconstruction
    Bilau, Abdulquadri Ade
    Witt, Emlyn
    Lill, Irene
    8TH NORDIC CONFERENCE ON CONSTRUCTION ECONOMICS AND ORGANIZATION, 2015, 21 : 313 - 320
  • [3] Understanding the Materiality of Disaster Injustice in Post-disaster Housing Reconstruction
    Cajilig, Pamela Gloria
    Santos, Monica F. A. W.
    Cervantes, Simon
    Sicam, Olivia Alma G.
    PHILIPPINE STUDIES-HISTORICAL AND ETHNOGRAPHIC VIEWPOINTS, 2023, 71 (04) : 529 - 560
  • [4] Real options analysis of revenue risk sharing in post-disaster housing reconstruction
    Vahdatmanesh, Mohammad
    Firouzi, Afshin
    Rotimi, James Olabode Bamidele
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2022, 27 (03) : 281 - 305
  • [5] The role of knowledge management in post-disaster housing reconstruction
    Thanurjan, Rajendram
    Seneviratne, L. D. Indunil P.
    DISASTER PREVENTION AND MANAGEMENT, 2009, 18 (01) : 66 - 77
  • [6] Post-Disaster Housing Reconstruction to Enable Resilient Communities
    Ahmed, Iftekhar
    Charlesworth, Esther
    OPEN HOUSE INTERNATIONAL, 2014, 39 (03) : 4 - 6
  • [7] AN ANALYSIS OF ISSUES FOR THE MANAGEMENT OF POST-DISASTER HOUSING RECONSTRUCTION
    Bilau, Abdulquadri Ade
    Witt, Emlyn
    INTERNATIONAL JOURNAL OF STRATEGIC PROPERTY MANAGEMENT, 2016, 20 (03) : 265 - 276
  • [8] Challenges Hindering the Resourcing for Post-Disaster Housing Reconstruction in Gaza
    Saleh, Nour
    Enshassi, Adnan
    Sundermeier, Matthias
    JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2021, 26 (02) : 183 - 210
  • [9] Aid Accountability and Participatory Approaches in Post-Disaster Housing Reconstruction
    Daly, Patrick
    Brassard, Caroline
    ASIAN JOURNAL OF SOCIAL SCIENCE, 2011, 39 (04) : 508 - 533
  • [10] The role of temporary accommodation buildings for post-disaster housing reconstruction
    Daniel Félix
    Daniel Monteiro
    Jorge M. Branco
    Roberto Bologna
    Artur Feio
    Journal of Housing and the Built Environment, 2015, 30 : 683 - 699