共 50 条
- [1] Optimal scheduling of distributed energy resources in a distribution system based on imperialist competitive algorithm considering reliability worth [J]. Neural Computing and Applications, 2014, 25 : 967 - 974
- [3] Optimal Scheduling of CCHP With Distributed Energy Resources Based on Water Cycle Algorithm [J]. IEEE ACCESS, 2019, 7 : 105583 - 105592
- [5] Day Ahead Scheduling of Distribution System With Distributed Energy Resources Considering Demand Response and Energy Storage [J]. 2013 NORTH AMERICAN POWER SYMPOSIUM (NAPS), 2013,
- [6] Novel imperialist competitive algorithm for distributed parallel machine scheduling problem [J]. Huazhong Keji Daxue Xuebao (Ziran Kexue Ban)/Journal of Huazhong University of Science and Technology (Natural Science Edition), 2019, 47 (08): : 86 - 91
- [8] Structural Reliability Analysis Based on Imperialist Competitive Algorithm [J]. 2013 FOURTH INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEMS DESIGN AND ENGINEERING APPLICATIONS, 2013, : 570 - 574
- [9] Optimal Scheduling of Integrated Energy System Considering Flexibility and Reliability [J]. Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2023, 47 (08): : 132 - 144
- [10] Imperialist Competitive Algorithm based optimal power flow [J]. 2014 22ND IRANIAN CONFERENCE ON ELECTRICAL ENGINEERING (ICEE), 2014, : 746 - 750