Applying an improved rapid impact assessment matrix method to strategic environmental assessment of urban planning in China

被引:22
|
作者
Li, Wei [1 ]
Xie, Yuanbo [1 ]
Hao, Fanghua [1 ]
机构
[1] Beijing Normal Univ, Sch Environm, State Key Lab Water Environm Simulat, Beijing 100875, Peoples R China
关键词
Strategic environmental assessment (SEA); Rapid impact assessment matrix (RIAM); Analytic Hierarchy Process (AMP); Integrated environmental score (IES); Indicator weighting; Urban planning; RIAM; EIA; COUNTRIES; SECURITY; DECISION; REGION; SYSTEM;
D O I
10.1016/j.eiar.2014.01.001
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Strategic environmental assessment (SEA) has become an increasingly important decision-support tool for providing information on the environmental implications of a policy, plan, or program. The goal is to safeguard the environment and promote sustainable development at the strategic level. Despite major progress in implementing SEA practices internationally, developing countries, such as China, often lag behind in applying SEA methodology. Lack of available data and time constraints arising from tight schedules create problems. The rapid impact assessment matrix (RIAM) is a potential resource for breaking through such difficulties. Our analysis of RIAM applications suggested that it could become a tool for evaluating strategic alternatives because of its applicability in interdisciplinary settings, its transparency, and its short implementation timeframe. To make it more suitable for the SEA context, we have developed two major improvements to the conventional RIAM process: assignment of weights to assessment indicators and the development of an integrated environmental assessment score (IES). The improved RIAM process was employed in an SEA of the development plan for the Nansha District in Guangzhou, the capital city of Guangdong Province in China. It was used to assess five alternatives for development in Wanqingsha (WQS), a subunit of Nansha, where important ecological resources are located and where industrial development could impact the air quality in the neighboring Hong Kong Special Administrative Region (HKSAR). The evaluation identified WQS-A04 as the preferred alternative. This alternative involved a minimal amount of industrial development - 10% compared with the most intense development alternative - and included important wetland preservation plans. The assessment results have been incorporated into the officially approved development plan for Nansha. The improved RIAM methodology is well adapted to the technical aims of SEA and decision-making structures in China. It offers the potential for delivering timely and quality results to decision-making processes. To achieve the desired efficiency, it is recommended that an SEA procedure take into account findings acquired from an improved RIAM application at an early stage, then, at a later stage, results from more comprehensive assessments conducted using more sophisticated methods should be added, if time and data are available. (C) 2014 Elsevier Inc. All rights reserved.
引用
收藏
页码:13 / 24
页数:12
相关论文
共 50 条
  • [1] Environmental impact assessment with rapid impact assessment matrix method: during disaster conditions
    Abbasi, Sina
    Modibbo, Umar Muhammad
    Kolashlou, Hamed Jafari
    Ali, Irfan
    Kavousi, Nader
    [J]. FRONTIERS IN APPLIED MATHEMATICS AND STATISTICS, 2024, 10
  • [2] Framework for integration of urban planning, strategic environmental assessment and ecological planning for urban sustainability within the context of China
    He, Jia
    Bao, Cun-Kuan
    Shu, Ting-Fei
    Yun, Xiao-Xue
    Jiang, Dahe
    Brown, Lex
    [J]. ENVIRONMENTAL IMPACT ASSESSMENT REVIEW, 2011, 31 (06) : 549 - 560
  • [3] Institutional Design for Strategic Environmental Assessment on Urban Economic and Social Development Planning in China
    Song, Guojun
    Zhou, Li
    Zhang, Lei
    [J]. ENVIRONMENTAL IMPACT ASSESSMENT REVIEW, 2011, 31 (06) : 582 - 586
  • [4] Environmental Health Impact Assessment and Urban Planning
    Shafie, Farah Ayuni
    Omar, Dasimah
    Karuppannan, Subramaniam
    [J]. ACE-BS 2013 HANOI (ASEAN CONFERENCE ON ENVIRONMENT-BEHAVIOUR STUDIES), 2013, 85 : 82 - 91
  • [5] Environmental Impact Assessment of a proposed Thermal power plant using Rapid Impact Assessment matrix Method
    Sundara Kumar, K.
    Shiva Kumar, B.V.
    Udaya Bhaskar, P.
    [J]. International Journal of Applied Environmental Sciences, 2010, 5 (05): : 669 - 682
  • [6] Integrating Strategic Environmental Assessment into Transport Planning Process in China
    Zhang, Zhiyan
    Shi, Fenghong
    Li, Fang
    [J]. PROCEEDINGS OF THE 2016 INTERNATIONAL FORUM ON ENERGY, ENVIRONMENT AND SUSTAINABLE DEVELOPMENT (IFEESD), 2016, 75 : 816 - 819
  • [7] Strategic environmental assessment of land-use planning in China
    Tang, T
    Zhu, T
    Xu, H
    Wu, J
    [J]. Environmental Informatics, Proceedings, 2005, : 41 - 51
  • [8] The Potential of Strategic Environmental Assessment to Improve Urban Planning in Sierra Leone
    Mabey, Prince T.
    Li, Wei
    Sundufu, Abu J.
    Lashari, Akhtar H.
    [J]. INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2021, 18 (18)
  • [9] Application of an Uncertainty Analysis Approach to Strategic Environmental Assessment for Urban Planning
    Liu, Yi
    Chen, Jining
    He, Weiqi
    Tong, Qingyuan
    Li, Wangfeng
    [J]. ENVIRONMENTAL SCIENCE & TECHNOLOGY, 2010, 44 (08) : 3136 - 3141
  • [10] Tiering strategic environmental assessment and project environmental impact assessment in highway planning in Sao Paulo, Brazil
    Sanchez, Luis E.
    Silva-Sanchez, Solange S.
    [J]. ENVIRONMENTAL IMPACT ASSESSMENT REVIEW, 2008, 28 (07) : 515 - 522