Immediate changes in stream channel geomorphology, aquatic habitat, and fish assemblages following dam removal in a small upland catchment

被引:76
|
作者
Magilligan, F. J. [1 ]
Nislow, K. H. [2 ]
Kynard, B. E. [3 ]
Hackman, A. M. [4 ]
机构
[1] Dartmouth Coll, Dept Geog, Hanover, NH 03755 USA
[2] USDA, Forest Serv, No Res Stn, Amherst, MA USA
[3] Univ Massachusetts, Dept Environm Conservat, Amherst, MA 01003 USA
[4] Massachusetts Div Ecol Restorat, Boston, MA USA
基金
美国国家科学基金会;
关键词
Dam removal; River restoration; Channel recovery; Fish habitat; Fragmentation; ELWHA RIVER; WASHINGTON; SEDIMENT; ATLANTIC; WISCONSIN; INFRASTRUCTURE; DEPOSITION; MAGNITUDE; TRANSPORT; RESPONSES;
D O I
10.1016/j.geomorph.2015.07.027
中图分类号
P9 [自然地理学];
学科分类号
0705 ; 070501 ;
摘要
Dam removal is becoming an increasingly important component of river restoration, with >1100 dams having been removed nationwide over the past three decades. Despite this recent progression of removals, the lack of pre- to post-removal monitoring and assessment limits our understanding of the magnitude, rate, and sequence of geomorphic and/or ecological recovery to dam removal. Taking advantage of the November 2012 removal of an old (similar to 190 year-old) 6-m high, run-of-river industrial dam on Amethyst Brook (26 km(2)) in central Massachusetts, we identify the immediate eco-geomorphic responses to removal. To capture the geomorphic responses to dam removal, we collected baseline data at multiple scales, both upstream (similar to 300 m) and downstream (>750 m) of the dam, including monumented cross sections, detailed channel-bed longitudinal profiles, embeddedness surveys, and channel-bed grain size measurements, which were repeated during the summer of 2013. These geomorphic assessments were combined with detailed quantitative electrofishing surveys of stream fish richness and abundance above and below the dam site and throughout the watershed and visual surveys of native anadromous sea lamprey (Petromyzon marinus) nest sites. Post-removal assessments were complicated by two events: (1) upstream knickpoint migration exhumed an older (ca. late eighteenth century) intact wooden crib dam similar to 120 m upstream of the former stone dam, and (2) the occurrence of a 10-20 year RI flood 6 months after removal that caused further upstream incision and downstream aggradation. Now that the downstream reach has been reconnected to upstream sediment supply, the predominant geomorphic response was bed aggradation and associated fining (30-60% reduction). At dam proximal locations, aggradation ranged from 03 to >1 m where a large woody debris jam enhanced aggradation. Although less pronounced, distal locations still showed aggradation with a mean depth of deposition of similar to 0.20 m over the 750-m downstream reach. Post-removal, but pre-flood, bed surveys indicate similar to 2 m of incision had migrated 25 m upstream of the former reservoir before encountering the exhumed dam, which now acts as the new grade control, limiting progressive headcutting. Approximately 1000 m(3) of sediment was evacuated in the first year, with similar to 67% of the volume occurring by pre-flood, process-driven (e.g., changes in base level) controls, The combination of changes in channel-bed sedimentology, the occurrence of a large magnitude flood, and the emergence of the new crib darn that is a likely barrier to fish movement was associated with major reductions in abundance and richness in sites downstream and immediately upstream adjacent to the former dam in post-removal sampling. At the same time, we documented the presence of four species of fish, including sea lamprey, which were not present above the dam prior to removal, indicating that upstream passage has been achieved; and we also documented lamprey spawning activity at sites immediately below the darn, which had previously been unsuitable owing to an excessively coarse and armored riverbed. Our results point to the importance of interactions between dam removal and flood disturbance effects, with important implications for short- and long-term monitoring and assessment of dam impacts to river systems. (C) 2015 Elsevier B.V. All rights reserved.
引用
下载
收藏
页码:158 / 170
页数:13
相关论文
共 1 条
  • [1] Time Series Changes in Fish Assemblages and Habitat Structures Caused by Partial Check Dam Removal
    Nagayama, Shigeya
    Ishiyama, Nobuo
    Seno, Taro
    Kawai, Hideyuki
    Kawaguchi, Yoichi
    Nakano, Daisuke
    Nakamura, Futoshi
    WATER, 2020, 12 (12)